Euro Tower (Bucharest)
Appearance
Euro Tower | |
---|---|
General information | |
Status | Completed |
Location | Bucharest, Romania |
Address | Strada Dinu Vintilă 11, București sector 2 |
Country | Romania |
Coordinates | 44°27′25″N 26°06′16″E / 44.4570°N 26.1044°E |
Construction started | 2008 |
Estimated completion | 2011 |
Cost | € 60,000,000 |
Owner | Cascade Group |
Height | |
Roof | 92 m (302 ft) |
Technical details | |
Floor count | 18 |
Floor area | 18,000 m2 (190,000 sq ft) |
Design and construction | |
Architect(s) | Dorin Ștefan, Chapman Taylor architects |
Developer | Cascade Group |
Awards and prizes | BREEAM Green Building Certification |
Euro Tower is a class A office building and the first Green building in Bucharest, awarded the BREEAM Post Construction Green Certificate.[1] It has 18 floors and a floor area of 18,000 metres (59,000 ft). At a height of 92 metres (302 ft), the construction was finished in 2010.[2][3]
See also
[edit]References
[edit]- ^ "Romania's first finalized green building: EuroTower - BuildGreen". buildgreen.ro. Retrieved 2017-09-19.
- ^ "Euro Tower, prima cladire de birouri cu certificat verde din Romania" (in Romanian). flux imobiliar. Archived from the original on 2014-03-18. Retrieved 2013-04-22.
- ^ "Cladirea de birouri Euro Tower a fost finalizata. Vezi cate spatii sunt goale" (in Romanian). Wall-Street.ro.