Durgam Cheruvu metro station
Appearance
Hyderabad Metro station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Hitech City Rd, Sri Sai Nagar, Madhapur, Hyderabad, Telangana - 500081[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 17°26′34″N 78°23′15″E / 17.44278°N 78.38750°E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owned by |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Hyderabad Metro Rail Ltd. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Blue Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 (2 side platform) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Elevated, Double track | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 20 March 2019 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Durgam Cheruvu Metro Station is located on the Blue Line of the Hyderabad Metro.[2][3]
History
[edit]It was opened on 20 March 2019.
The station
[edit]Structure
[edit]Durgam Cheruvu elevated metro station situated on the Blue Line of Hyderabad Metro.[1]
Facilities
[edit]The stations have long staircases, elevators and escalators from the street level to the platform level which provide easy and comfortable access. Also, operation panels inside the elevators are installed at a level that can be conveniently operated by all passengers, including differently-abled and elderly citizens.[1]
Station layout
[edit]- Street Level
- This is the first level where passengers may park their vehicles and view the local area map.[4]
- Concourse level
- Ticketing office or Ticket Vending Machines (TVMs) is located here. Retail outlets and other facilities like washrooms, ATMs, first aid, etc., will be available in this area.[4]
- Platform level
- This layer consists of two platforms. Trains takes passengers from this level.[4]
L1 Platforms |
Side platform, doors will open on the left | |
Platform 2 | Blue Line toward Nagole (Madhapur) → | |
Platform 1 | ← Blue Line toward Raidurg (HITEC City) | |
Side platform, doors will open on the left | ||
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Entrances and exits
[edit]- Mezzanine (M)
See also
[edit]References
[edit]- ^ a b c "Metro Stations".
- ^ Kumar, V. Rishi (5 November 2018). "Hyderabad metro to commission line up to Hitec City by year end". The Hindu Business Line. Retrieved 20 February 2020.
- ^ Sripada, Krishna (3 May 2018). "Hyderabad metro stations we keenly await". The Hindu.
- ^ a b c "Metro Stations".