Dumai-Malacca Cable System
Appearance
Dumai-Malacca Cable System or DMCS is a submarine telecommunications cable system linking Indonesia and Malaysia across the Strait of Malacca
It has landing points in:
It has a design transmission capacity of 320 Gbit/s of which 20 Gbit/s were lit at inception, and a total cable length of 150 km. It was inaugurated on 17 February 2005.
References
[edit]- "Dumai-Melaka Cable completed" (PDF). NEC. Archived from the original (PDF) on 2007-01-07. Retrieved 15 February 2006.
- "Kabel Laut Dumai-Melaka Strategis untuk ASEAN". Kompas (in Indonesian). Archived from the original on 24 November 2005. Retrieved 15 February 2006.