Den Chai railway station
This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. (January 2014) |
Den Chai เด่นชัย | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Den Chai Subdistrict, Den Chai District, Phrae 54110 | ||||||||||
Owned by | State Railway of Thailand | ||||||||||
Operated by | State Railway of Thailand | ||||||||||
Line(s) | Northern Line (Thailand) | ||||||||||
Platforms | 3 | ||||||||||
Tracks | 6 | ||||||||||
Construction | |||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | ดช. | ||||||||||
Services | |||||||||||
|
Den Chai station (Thai: สถานีเด่นชัย) is a railway station located in Den Chai Subdistrict, Den Chai District, Phrae. It is a Class 1 railway station and is the main station for Phrae Province, as there is no rail service to Phrae City. It is located about 530 kilometres (330 mi) from Bangkok railway station. It is also the station to alight for passengers heading to Nan Province.
History
[edit]Den Chai Station was opened in 1912 during the King Rama VI's reign as Phrae provincial railway station. In the olden days, the station was once used as a hub for various types of commodities, for example the shipping of wood, heavy products, as well as loads of packages would be conveyed here, also it was a distribution centre to provinces in the immediate vicinity. During that time, the station master had more powers than the district chief.
The exact station building was renovated around 1957. The building constructed with the entire wooden structures, including ancient teak wood, was adjusted and extended to provide a larger usable area. It is transformed into a cemented building with structures like butterfly roofing and a spacious with lengthy platform to accommodate the utilities.
A new 323 kilometer-long branch line, branching off from Den Chai station to the Lao border at Chiang Khong, is under construction and is expected to open in 2028. [1][2]
References
[edit]- ^ The History of Den Chai–Chiang Khong Dual-Track Railway Project, 1 March 2023
- ^ "Excavation Begin on 6.2-Kilometer Railway Tunnel in Chiang Rai". Chiang Rai Times. 2023-03-06. Retrieved 2023-06-05.
- "Train services". State Railway of Thailand. 2019. Archived from the original on 10 October 2006. Retrieved 27 August 2019.
- "All sorts of information". State Railway of Thailand. 21 February 2019. Archived from the original on 21 February 2019. Retrieved 27 August 2019, at the Wayback Machine
{{cite web}}
: CS1 maint: postscript (link)
17°58′49″N 100°02′47″E / 17.9803°N 100.0464°E