Davao–Samal Bridge

From Wikipedia, the free encyclopedia

Davao–Samal Bridge
Coordinates7°06′15″N 125°39′30″E / 7.1042°N 125.6583°E / 7.1042; 125.6583
CarriesMotor vehicles, pedestrians and bicycles
CrossesPakiputan Strait
LocaleDavao del Norte, Philippines
Characteristics
Total length3.98 km (13,058 ft)[1]
Longest span270 m (886 ft)[1]
Clearance above47 m (154 ft)[1]
No. of lanes4[1]
History
Constructed by
Construction cost₱23 billion
Location
Map

The Samal Island–Davao City (SIDC) Connector,[2] commonly known as the Davao–Samal Bridge, is an under-construction bridge that will cross Pakiputan Strait to connect mainland Mindanao via Davao City and Samal, Davao del Norte in the Philippines. On January 14, 2021, the Philippine and Chinese governments signed a contract to design and construct the bridge, costing P23 billion pesos.[1][3] On October 27, 2022, President Bongbong Marcos led the groundbreaking ceremony for the construction of the bridge.[4]

Background

[edit]

Plans for a bridge linking Davao City and the island of Samal were made as early as 1970.[5]

The 3.98-kilometer bridge, a flagship project under the “Build, Build, Build” program during the administration of former President Rodrigo Duterte, will be hugely funded through a loan agreement with the Chinese government.[6]

The bridge project will connect the Samal Circumferential Road in Caliclic, Samal to the R. Castillo–Daang Maharlika junction in Buhangin, Davao City across the Pakiputan Strait. The bridge, which is 3.98 kilometers long, will be constructed within five years and is set to be completed and operational in 2027. Once completed, it is expected to reduce travel time from Davao City to Samal from around 30 minutes via ferry to only five minutes. The construction of the bridge will be funded through a loan agreement worth US$350 million or ₱18.67 billion entered into between the Philippines and China, covering 90 percent of the project cost.[7]

As of May 2024, the Department of Public Works and Highways has already started the bridge's civil works phase. Its design includes a 275-meter main span and a 47-meter vertical navigation clearance. Environmentalists and right-of-way owners opposed the project especially on the current bridge alignment, landing site (Lucas-Rodriguez family property) and the offshore construction which could destroy the alleged healthy “Paradise Reef” on the Samal Island side. The 2020 environmental impact assessment of Ove Arup & Partners Hong Kong Ltd. classified the bridge an “environmentally critical project.”[8][9]

The four-lane, cable-stayed bridge bridge is slated to be completed in August 2027. "China Road and Bridge Corporation and DPWH Region XI have finished the bridge's design and planning phase and is currently estimated to be at 3.487% completion rate," Department of Public Works and Highways-11 Director Engr. Juby Cordon announced in a press release.[10]

References

[edit]
  1. ^ a b c d e "Samal Island-Davao City bridge contract signed". Philippine Information Agency. January 14, 2021. Retrieved January 23, 2021.
  2. ^ Colina IV, Antonio L. (October 17, 2022). "Chinese workers spotted anew off Samal resorts opposing Samal-Davao bridge project, says group". MindaNews. Retrieved October 23, 2022.
  3. ^ Llemit, Ralph Lawrence G. (January 14, 2021). "Philippines, China sign commercial contract for Davao-Samal Bridge". SunStar Davao. Retrieved January 23, 2021.
  4. ^ "Marcos leads P23-B Davao-Samal bridge project groundbreaking amid protests". RAPPLER. October 27, 2022. Retrieved November 11, 2022.
  5. ^ Colina IV, Antonio L. (September 29, 2024). "Realignment of Davao-Samal bridge project sought to save reef". MindaNews.
  6. ^ Pinlac, Beatrice (October 27, 2022). "Bongbong Marcos leads Samal-Davao bridge groundbreaking in Davao City". INQUIRER.net. Retrieved November 11, 2022.
  7. ^ "Marcos to lead groundbreaking rites of P23-B Samal Island-Davao City bridge". Manila Bulletin. October 26, 2022. Retrieved November 11, 2022.
  8. ^ "Island hopping made easy: P19 billion bridge linking Davao to Samal underway". bilyonaryo.com. May 1, 2024. Retrieved May 4, 2024.
  9. ^ Sarmiento, Bong (April 26, 2024). "Work on Samal-Davao bridge to begin soon, says DPWH". Philippine Daily Inquirer. Retrieved May 4, 2024.
  10. ^ Palicte, Che (May 28, 2024). "Samal-Davao bridge construction in full swing, set to finish in 2027". Philippine News Agency. Retrieved June 1, 2024.