Jump to content

Daojiao railway station

Coordinates: 22°59′37″N 113°39′14″E / 22.9936°N 113.653886°E / 22.9936; 113.653886
From Wikipedia, the free encyclopedia
Daojiao

道滘
PRDIR
Platform
Chinese name
Chinese道滘站
Transcriptions
Standard Mandarin
Hanyu PinyinDàojiào Zhàn
Yue: Cantonese
JyutpingDou6gaau3 Zaam6
General information
LocationIntersection of Shuixiang Boulevard (水乡大道) and Hongnan Road (虹南路), Daojiao, Dongguan, Guangdong
China
Coordinates22°59′37″N 113°39′14″E / 22.9936°N 113.653886°E / 22.9936; 113.653886
Owned byPearl River Delta Metropolitan Region intercity railway
Operated byGuangdong Intercity Railway Operation Co., Ltd.
Line(s)Guangzhou–Huizhou intercity railway
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
Station codeRRQ (Pinyin: DJI)
History
Opened28 December 2017; 6 years ago (2017-12-28)
Services
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Pearl River Delta Metropolitan Region Intercity Railway Following station
Dongguan West
towards Panyu
Guangzhou–Huizhou intercity railway Xiping West
towards Xiaojinkou

Daojiao railway station (Chinese: 道滘站; pinyin: Dàojiào Zhàn; Jyutping: Dou6gaau3 Zaam6) is a railway station in Daojiao, Dongguan, Guangdong, China. It opened on December 28, 2017, and was the western terminus of the Guangzhou–Huizhou intercity railway before Dongguan West opened on December 15, 2019.[1]

History

[edit]

In the early stage of Dongguan-Huizhou intercity planning, the station was planned to be located about 300m southeast of the current site. In 2010, after the Ministry of Railways intervened in the construction of the Pearl River Delta Metropolitan Region intercity railway, the line scheme was redesigned. In the end, due to the change of the interchange plan between the line and the Guangzhou–Shenzhen intercity railway and the need for the Dongguan urban section to go underground, the station position of this station was fine-tuned to the current location.[2]: 87–89 

References

[edit]
  1. ^ 刘光明宝 (2017-12-29). "惠州小金口至东莞道滘全程约60分钟" [The journey from Huizhou Xiaojinkou to Dongguan Daojiao takes about 60 minutes]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-04. Retrieved 2024-08-07 – via Sina Corporation.
  2. ^ "东莞至惠州城际轨道交通项目(变更)环境影响报告书(全本公示)" [Dongguan to Huizhou Intercity Rail Transit Project (Change) Environmental Impact Report (Full Publication)]. China Railway Engineering Design Consulting Group Co., Ltd. (in Simplified Chinese). 2015-11-20. Archived from the original on 2019-05-10. Retrieved 2024-08-07.
[edit]