Cizre Dam
Cizre Dam | |
---|---|
Official name | Cizre Baraji |
Location | Cizre, Şırnak Province, Turkey |
Coordinates | 37°21′47″N 42°09′17″E / 37.36306°N 42.15472°E |
Purpose | Power, irrigation |
Status | Under construction |
Owner(s) | State Hydraulic Works |
Dam and spillways | |
Type of dam | Embankment, earth-fill |
Impounds | Tigris River |
Height | 46 m (151 ft) |
Length | 740 m (2,428 ft) |
Elevation at crest | 409 m (1,342 ft) |
Width (crest) | 15 m (49 ft) |
Width (base) | 190 m (623 ft) |
Dam volume | 3,300,000 m3 (2,675 acre⋅ft) |
Spillway type | Service overflow, controlled-chute |
Spillway capacity | 18,700 m3/s (660,384 cu ft/s) |
Reservoir | |
Creates | Cizre Reservoir |
Total capacity | 360,000,000 m3 (290,000 acre⋅ft) |
Active capacity | 208,000,000 m3 (169,000 acre⋅ft) |
Inactive capacity | 152,000,000 m3 (123,000 acre⋅ft) |
Catchment area | 38,295 km2 (14,786 sq mi) |
Surface area | 21 km2 (8.1 sq mi)[1] |
Maximum length | 40 km (25 mi) |
Normal elevation | 404.4 m (1,327 ft) |
Power Station | |
Hydraulic head | 36 m (118 ft) (gross) |
Turbines | 3 x 80 MW Francis-type |
Installed capacity | 240 MW |
Website [1] |
The Cizre Dam is a dam being constructed on the Tigris River north of Cizre, Turkey.[2] The Cizre Dam is to be built in conjunction and downstream of the Ilisu Dam. The Cizre Dam is also one of the planned dams of Turkey's Southeastern Anatolia Project (GAP). The purpose of the Cizre Dam is irrigation, hydro-power and to control the tailwaters of the Ilisu Dam.
A tender for the Cizre Dam was unsuccessfully issued in May 2008 but another issue on 15 May 2014 left Zorlu Energy as the winning bidder.[3][4] The Cizre Dam will have a hydro-power capacity of 240 MW and will provide irrigation for 121,000 hectares.[5] It was approved by the government in 2023 and is planned to be completed by 2027.[6]
A 2023 study predicted that this and other dams would have considerable sociological impact downstream in Iraq.[7]
Cizre Dam construction started as of September 2024 [8]
References
[edit]- ^ "Ilisu Dam Environmental Impact Assessment" (PDF). State Hydraulic Works. 2005. pp. TABLE 2–3 (PDF pgs. 112–113). Archived from the original (PDF) on 26 September 2015. Retrieved 20 May 2013.
- ^ "Top five hydro power plants in development in Turkey". Power Technology. 2023-05-10. Retrieved 2024-03-17.
- ^ "Cizre dam will destroy thousands of years of history turns out to tender" (in Turkish). DİHA - Dicle News Agency. 12 May 2014. Archived from the original on 6 June 2014. Retrieved 12 May 2014.
- ^ "Zorlu Energy, Cizre Dam and HEPP projects that result in their favor for the tender announced" (in Turkish). Borsa Gundem. 15 May 2014. Retrieved 3 June 2014.
- ^ "Turkey: Completion of Cizre Dam Tender Will Earn Treasury $3.2 Billion". Memri Economic. 1 January 2008. Retrieved 12 May 2014.
- ^ "Planned Turkish dam on Tigris may harm environment, Kurdish communities". Medya News. 2023-08-20. Retrieved 2024-03-17.
- ^ Torabi Haghighi, Ali; Akbari, Mahdi; Noori, Roohollah; Danandeh Mehr, Ali; Gohari, Alireza; Sönmez, Mehmet Emin; Abou Zaki, Nizar; Yilmaz, Nese; Kløve, Bjørn (2023). "The impact of Turkey's water resources development on the flow regime of the Tigris River in Iraq". Journal of Hydrology: Regional Studies. 48. doi:10.1016/j.ejrh.2023.101454.
- ^ "Cizre Barajı inşaatı başladı: Çok sayıda köy ve tarihi alan sulara gömülecek". 27 September 2024.