Chitral hydel power
Appearance
Chitral hydel power is a hydroelectric power station which is located on the right bank of Lutkho river and 5 Km upstream of Chitral city. The flow of Lutkho river was diverted by a 3.72 Km long channel. The power station is equipped with 2 units of 200 kW and 2 units of 300 kW each to cumulatively generate 1 MW of electricity. The power generated from the power station is being provided to the Chitral city through an 11 kV transmission line. The project was commissioned in 1975.[1]
Chitral Hydel Power Station | |
---|---|
Official name | Chitral Hydel Power |
Location | Chitral, Khyber Pakhtunkhwa, Pakistan |
Purpose | Power Generation |
Owner(s) | Water and Power Development Authority (WAPDA) |
Power Station | |
Turbines | 2 x 200 kW 2 x 300 kW |
Installed capacity | 1 MW |
Annual generation | 4.13 GWh |
See also
[edit]- List of dams and reservoirs in Pakistan
- List of power stations in Pakistan
- Satpara Dam
- Allai Khwar Hydropower Project
- Gomal Zam Dam
References
[edit]- ^ "Chitral Hydel Power". wapda.gov.pk. Retrieved 2022-07-25.