Chengshan Road station
Appearance
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Shanghai China | |||||||||||||||
Coordinates | 31°10′20″N 121°29′28″E / 31.1722°N 121.491°E | |||||||||||||||
Operated by | Shanghai No. 2 Metro Operation Co. Ltd. (Line 13) Shanghai No. 4 Metro Operation Co. Ltd. (Line 8) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 5 July 2009 (Line 8) 30 December 2018 (Line 13) | |||||||||||||||
Services | ||||||||||||||||
|
Chengshan Road (Chinese: 成山路; pinyin: Chéngshān Lù) is an interchange station on Lines 8 and 13 of the Shanghai Metro. This station opened as part of the southern extension of Line 8 on 5 July 2009. It became an interchange station with the opening of phases two and three of Line 13 on 30 December 2018.[1] The station is located in Shanghai's Pudong New Area.
Station Layout
[edit]G | Entrances and Exits | Exits 1-5 |
B1 | Line 8 Concourse | Faregates, Station Agent |
B2 | Line 13 Concourse | Faregates, Station Agent |
Northbound | ← Line 8 towards Shiguang Road (Yaohua Road) | |
Island platform, doors open on the left | ||
Southbound | Line 8 towards Shendu Highway (Yangsi) → | |
B3 | Westbound | ← Line 13 towards Jinyun Road (Changqing Road) |
Island platform, doors open on the left | ||
Eastbound | Line 13 towards Zhangjiang Road (Dongming Road) → |
References
[edit]- ^ Shanghai Shentong Metro Group Co., Ltd. (2018-12-28). 5号线南延伸和13号线二、三期12月30日起试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese). Retrieved 2018-12-29.[permanent dead link]