Changping station (Guangzhou Metro)
Appearance
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 长平站 | ||||||||||
Traditional Chinese | 长平站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Guangshan Highway Yongshun Dadao, Huangpu District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 21 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 2111 | ||||||||||
History | |||||||||||
Opened | 20 December 2019 | ||||||||||
Services | |||||||||||
|
Changping Station (Chinese: 长平站; pinyin: chángpíng) is a station on Line 21 of the Guangzhou Metro that became operational on 20 December 2019.
Station layout
[edit]F4 | - | Passageway between Platforms 1 & 2 |
F3 Platforms |
North Lobby | Customer Service, Vending machines |
Side platform, doors will open on the right | ||
Platform 2 | 21 towards Tianhe Park (Shuixi) | |
Platform 1 | 21 towards Zengcheng Square (Jinkeng) | |
Side platform, doors will open on the right | ||
South Lobby | Customer Service, Vending machines | |
F2 Buffer Area |
Buffer Area | Buffer area of South Lobby, Station equipment |
Pedestrian Overpass | Passageway between North & South Lobbies | |
G Concourse |
- | Exits, Station equipment, Shops, Toilet |
Exits
[edit]Exit number | Exit location | |
---|---|---|
Exit A | Yongshun Dadao | |
Exit B1 | Yongshun Dadao | |
Exit B2 | Yongshun Dadao | |
Exit C1 | Yongshun Dadao | |
Exit C2 | Yongshun Dadao | |
Exit C3 | Yongshun Dadao | |
Exit D | Yongshun Dadao |
Gallery
[edit]-
West Concourse
-
East Concourse
-
Platform 1
-
F4 passageway between platforms 1 and 2
-
Exit A
-
Exit B1
-
Exit B2
-
Exit C1
-
Exit C2
-
Exit C3
-
Exit D
References
[edit]