Changping Xishankou station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Nanjian Road (南涧路) and Wanxi Road (万西路) Shisanling, Changping District, Beijing China | ||||||||||
Coordinates | 40°14′41″N 116°11′43″E / 40.244624°N 116.195371°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Changping line | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 26, 2015 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Changping Xishankou station[1] (Chinese: 昌平西山口站; pinyin: Chāngpíng Xīshānkǒu zhàn) is a station on the Changping Line of the Beijing Subway. It was opened on 26 December 2015.[2] It is the current northern terminus of the line as well as the northernmost station in the entire Beijing Subway.
Station layout
[edit]The station has an underground island platform.
Exits
[edit]There are 4 exits, lettered A, B, C, and D. Exit B is accessible.
References
[edit]- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
- ^ 北京地铁昌平线二期开通时间、线路图及站厅效果图(图) (in Chinese (China)).