Chacaíto station
Appearance
Chacaíto | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Caracas Metro rapid transit station | |||||||||||
General information | |||||||||||
Location | Chacao, Miranda Venezuela | ||||||||||
Coordinates | 10°29′29.5″N 66°52′02.7″W / 10.491528°N 66.867417°W | ||||||||||
Operated by | C.A. Metro de Caracas | ||||||||||
Line(s) | Line 1 | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | underground | ||||||||||
History | |||||||||||
Opened | 27 March 1983[1] | ||||||||||
Services | |||||||||||
|
Chacaíto is a Caracas Metro station on Line 1. It was opened on 27 March 1983 as the eastern terminus of the extension of Line 1 from La Hoyada.[2] On 23 April 1988 the line was extended to Los Dos Caminos. The station is between Sabana Grande and Chacao.[1][3]
References
[edit]- ^ a b Schwandl, Robert. "Caracas". www.urbanrail.net.
- ^ Engineering News-record. McGraw-Hill. 1976.
- ^ Transporte, Venezuela Oficina Ministerial del (1968). Caracas Metro: Informational Document for Firms, Financial Institutions and Governments Interested in Participating in the Execution of the Project.