Brown Line
(Line 12)
Overview
StatusApproved[1]
OwnerDelhi Metro
LocaleDelhi
Termini
Stations8
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned openingMarch 2026; 1 year's time (2026-03)[2][3]
Technical
Line length7.96 km (4.95 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Lajpat Nagar
Andrews Ganj
Greater Kailash-1
Chirag Delhi
Pushpa Bhawan
Saket District Centre
Pushp Vihar
Saket G Block

The Brown Line (Line 12) is an approved line of the Delhi Metro. It will provide improved direct connections to eastern, southern and south-eastern Delhi with the Indira Gandhi International Airport and Faridabad to decrease the increasing traffic, congestion and pollution on roads. It will act as a link line, by joining four lines–Violet, Pink, Magenta and Golden lines with each other. It will start from Lajpat Nagar and will end in Saket G-Block. It will be 7.96 km (4.95 mi) long with eight stations, all of which will be elevated. The line was approved by the Government of India and the foundation stone was laid for its construction by Prime Minister Narendra Modi on 14 March 2024, and work is yet to begin, as part of the fourth phase of the Delhi Metro's development. The line is slated to be completed by March 2026.[4][5][1][3][2][6]

History

[edit]

The Brown Line was first conceived by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Brown Line will connect Lajpat Nagar with Saket, at a length of 7.96 km (4.95 mi). The plans were finalized for implementation by the Government of Delhi in December 2018.[7] In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Brown Line began from April 2019, and was completed in three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic.[8] It was expected to be completed by 2025.[4] On 13 March 2024, the Brown Line and the Indigo Line were approved by the cabinet, to be built at a cost of about 8,400 crore (US$1.0 billion). Hence, the foundation stone was laid for its construction by Prime Minister Narendra Modi on 14 March 2024, and work is yet to begin. Both the lines are slated to be completed by March 2026.[2][1][3][6]

Stations

[edit]

The stations the Brown Line will have are:[5][3]

Brown Line
No. Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Lajpat Nagar लाजपत नगर 4 March 2026 Pink Line
Violet Line
Elevated Side None None
2 Andrews Ganj एंड्रयूज़ गंज None
3 Greater Kailash-1 ग्रेटर कैलाश-१
4 Chirag Delhi चिराग दिल्ली Magenta Line
5 Pushpa Bhawan पुष्प भवन None
6 Saket District Centre साकेत जिला केंद्र
7 Pushpa Vihar पुष्प विहार
8 Saket G-Block साकेत जी-ब्लॉक Golden Line
(Phase 4 - Under Construction)

Project timeline

[edit]
  • April 2019: Land acquisition begins for the Brown Line.
  • October 2023: The line is expected to be completed by mid-2025 or 2026. Construction is expected to begin from 2024.[8][2]

Train info

[edit]
Brown Line
Rakes TBD
Train Length TBD
Train Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification 25 kV 50 Hz AC through overhead catenary (OHE)
Train's Maximum Speed TBD
Train Operation Delhi Metro

See also

[edit]

References

[edit]
  1. ^ a b c d "Delhi Metro network set to expand further as Modi cabinet approves expansion worth $1 billion". WION. 13 March 2024. Retrieved 15 March 2024.
  2. ^ a b c d Mishra, Sunita (16 October 2023). "Delhi Metro Brown Line: Route, Stations and the Latest Update". Housing.com. Retrieved 12 February 2024.
  3. ^ a b c d e "PM Modi Lays Foundation Stone Of 2 Additional Corridors Of Delhi Metro's Phase 4". NDTV. 14 March 2024. Retrieved 15 March 2024.
  4. ^ a b "The remaining 3 corridors of the Delhi Metro Phase-4 Project will not be completed by 2025 at the cost of Rs. 12,600 CR". Metro Rail News. 3 November 2021. Retrieved 27 May 2022.
  5. ^ a b "Delhi metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
  6. ^ a b c "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 12 February 2024.
  7. ^ a b "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
  8. ^ a b "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.