Jump to content

Borumba Dam Pumped Hydro Power Station

From Wikipedia, the free encyclopedia

The Borumba Dam Pumped Hydro Power Station is a proposed 2,000 MW pumped hydro energy storage system at Lake Borumba, located in Imbil, south-west of Gympie in Queensland, Australia. First power is expected in 2030.[1][2] A state-owned entity called Queensland Hydro is coordinating the project.[3]

The land for the pumped hydro scheme was purchased by the Bjelke-Petersen state government following a Cabinet decision in August 1985.[4] Plans for the scheme were announced in September 2022.[3] The project is expected to cost $14.2 billion.[1] Borumba Dam will be expanded for the project.[3] A new dam wall is to be constructed downstream. A second reservoir is needed to be constructed.[3] It will be built at a higher altitude than Borumba Dam.

See also

[edit]

References

[edit]
  1. ^ a b "Borumba Pumped Hydro Project". Queensland Hydro. Retrieved 2 April 2024.
  2. ^ Sheehan, Amy; Ross, Jessica; Easton, Alex (19 September 2024). "Borumba Pumped Hydro's $14.2 billion renewable energy project construction start date thrown into doubt". ABC News. Retrieved 11 November 2024.
  3. ^ a b c d Ross, Jessica (23 February 2024). "Borumba Pumped Hydro Project attracts state funding for GP clinic, millions to Imbil, as site investigation continues". ABC News. Retrieved 2 April 2024.
  4. ^ Cabinet Minutes 6 August 1985