Jump to content

Bihać Golubić Airport

Coordinates: 44°47′49.6″N 15°54′15.8″E / 44.797111°N 15.904389°E / 44.797111; 15.904389 (Bihać Golubić Airport (Bihać))
From Wikipedia, the free encyclopedia
Bihać Golubić Airport
Summary
Airport typePublic
ServesBihać
Location Bosnia and Herzegovina
Elevation AMSL820 ft / 250 m
Coordinates44°47′49.6″N 15°54′15.8″E / 44.797111°N 15.904389°E / 44.797111; 15.904389 (Bihać Golubić Airport (Bihać))
Map
LQBI is located in Bosnia and Herzegovina
LQBI
LQBI
Location of Bihać Golubić Airport in Bosnia and Herzegovina
Map
Runways
Direction Length Surface
ft m
12/30 3,410 1,039 Grass
Source: Landings.com[1][2]

Bihać Golubić Airport (ICAO: LQBI) is a public use airport located near Bihać, Unsko-sanski Kanton, Bosnia and Herzegovina.

A new International Airport is under construction at the site, whose total value is estimated in EUR 20-25 million, of which EUR 5 million for the new runway. In 2017, the government of the Federation of Bosnia and Herzegovina entity allocated some EUR 2 million, followed by EUR 1.25 million in 2018,[3] and EUR 1.8 million in 2019.[4] In 2020, it received EUR 150.000 for operating costs, despite being "not even visible on online aviation radar services."[citation needed]

Bihac International Airport Construction Timeline

[edit]
  • November 2017 -Bihac Airport has announced a tender for the design of the "Bihac International Airport"[5][better source needed]
  • September 2018 - Bihac International Airport environmental study completed.[6]
  • September 2020 - Government of Federation of Bosnia and Herzegovina issued environmental permit for Bihac airport construction.[7]
  • May 2019 - Construction of 2.2 kilometers long Runway at Bihac Airport started.[8]
  • October 2020 - Bosnia's Euroing company completes main design of Bihac airport.[9][10]
  • January 2021 - Government of Federation of Bosnia and Herzegovina allocates 12 million Euros in 2021 budget for construction of Bihac Airport.[11]
  • December 2021 - Government of Federation of Bosnia and Herzegovina allocates 2,5 million Euros in 2022 budget for land expropriation for the construction of Bihac Airport.[12]

See also

[edit]

References

[edit]
  1. ^ Airport record for Bihać Golubić Airport Archived 2013-08-15 at archive.today at Landings.com. Retrieved 2013-08-15
  2. ^ "location of Bihać Golubić Airport" (Map). Google Maps. Retrieved 2013-08-15.
  3. ^ Dzaferovic, Amina (April 15, 2018). "Construction of a Runway for the Airport "Golubic" in Bihac to start this Year?". Sarajevo Times.
  4. ^ "Bihać Airport to build test runway". May 18, 2019.
  5. ^ "Bosnia and Herzegovina Aviation News : ✈Tender for Bihac Airport design". 23 November 2017.
  6. ^ "STUDIJA O PROCJENI UTJECAJA NA OKOLINU ZA JP AERODROM BIHAĆ d.o.o. BIHAĆ" (PDF). mzoe.gov.hr. September 2018. Retrieved July 22, 2024.
  7. ^ "Bosnia's Federation awards environmental permit for Bihac airport construction". SeeNews.
  8. ^ "Construction of 2.2 kilometers long Runway at Bihac Airport started". 19 May 2019.
  9. ^ "Bosnia's Euroing completes main design of Bihac airport". SeeNews.
  10. ^ Archived at Ghostarchive and the Wayback Machine: Izgled aerodroma i terminala u Bihaću, Euroing d.o.o. Bihać (Projektant). YouTube.
  11. ^ "Vlada FBiH za izgradnju aerodroma u Bihaću u budžetu planirala 25 miliona KM".
  12. ^ "296. sjednica Vlade Federacije BiH". Archived from the original on 2021-12-31. Retrieved 2021-12-31.
[edit]