Arkansas Highway 195
This article needs additional citations for verification. (April 2021) |
Route information | ||||
---|---|---|---|---|
Maintained by ArDOT | ||||
Section 1 | ||||
Length | 13.91 mi[1] (22.39 km) | |||
South end | AR 355 in Fulton | |||
North end | US 278 in Washington | |||
Section 2 | ||||
Length | 6.81 mi[1] (10.96 km) | |||
South end | AR 332 in De Ann | |||
North end | US 371 near Blevins | |||
Section 3 | ||||
Length | 12.30 mi[1] (19.79 km) | |||
South end | US 371 near McCaskill | |||
North end | AR 19 / AR 26 in Delight | |||
Location | ||||
Country | United States | |||
State | Arkansas | |||
Counties | Hempstead, Pike | |||
Highway system | ||||
|
Arkansas Highway 195 (AR 195, Ark. 195, and Hwy. 195) is the designation for a state highway in the U.S. state of Arkansas. The route is split into three sections, all of which are located in southwest Arkansas. The first section begins at AR 355 in Fulton, and ends at US 278 in Washington. The second section begins at AR 332 in De Ann, and ends at US 371 just east of Blevins. The third section begins at US 371 just east of McCaskill, and ends at AR 19/AR 26 in Delight. All three routes are maintained by the Arkansas Department of Transportation (ARDOT).[2][3]
Route description
[edit]Section 1
[edit]The first section of AR 195 begins at AR 355 in Fulton. The route runs towards the northeast for about 9.5 miles (15.3 km) before intersecting AR 73 in Cross Roads. The route continues northwest for about 4.4 miles (7.1 km) before reaching its northern terminus at US 278 in Washington.[2][4]
Section 2
[edit]The second section of AR 195 begins at AR 332 in De Ann. The route heads almost directly north for about 6.8 miles (10.9 km) before reaching its northern terminus at US 371 just east of Blevins. The route does not intersect any other communities or highways throughout its entire length.[2][5]
Section 3
[edit]The third section of AR 195 begins at US 371 just east of McCaskill. The route heads mainly towards the east, before turning towards the north shortly before crossing the Little Missouri River. Shortly after, the route intersects AR 301 just south of Pisgah, which provides direct access to the Crater of Diamonds State Park. The route continues for just under 5 miles (8.0 km) before intersecting AR 19/AR 26 in Delight.[2][3][6]
Major intersections
[edit]County | Location | mi | km | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Hempstead | Fulton | 0.00 | 0.00 | AR 355 to US 67 – Fulton, Millwood Dam | Southern terminus | ||
Cross Roads | 9.50 | 15.29 | AR 73 – Hope, Saratoga | ||||
Washington | 13.91 | 22.39 | US 278 – Hope, Nashville | Northern terminus | |||
Gap in route | |||||||
De Ann | 0.00 | 0.00 | AR 332 – De Ann, Prescott | Southern terminus | |||
Blevins | 6.81 | 10.96 | US 371 – Prescott, Blevins | Northern terminus; former AR 24 | |||
Gap in route | |||||||
McCaskill | 0.00 | 0.00 | US 371 – Blevins, McCaskill | Southern terminus; former AR 24 | |||
Pike | Pisgah | 7.50 | 12.07 | AR 301 – Billstown, Crater of Diamonds State Park | |||
Delight | 12.30 | 19.79 | AR 19 / AR 26 – Antoine, Murfreesboro | Northern terminus | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
[edit]- ^ a b c Planning and Research Division (April 24, 2021). "Arkansas Road Log Database". Arkansas Department of Transportation. Archived from the original (MBD) on January 23, 2016.
- ^ a b c d Planning and Research Division (n.d.). General Highway Map: Hempstead County (PDF) (Map). 1:62,500. Little Rock: Arkansas State Highway and Transportation Department.
- ^ a b Planning and Research Division (n.d.). General Highway Map: Pike County (PDF) (Map). 1:62,500. Little Rock: Arkansas State Highway and Transportation Department.
- ^ "Overview: AR 195 (Section 1)" (Map). Google Maps. Retrieved April 24, 2021.
- ^ "Overview: AR 195 (Section 2)" (Map). Google Maps. Retrieved April 24, 2021.
- ^ "Overview: AR 195 (Section 3)" (Map). Google Maps. Retrieved April 24, 2021.