A77 autoroute
You can help expand this article with text translated from the corresponding article in French. (March 2024) Click [show] for important translation instructions.
|
A77 autoroute | |
---|---|
l'Arbre | |
Route information | |
Length | 161 km (100 mi) |
Existed | 1971–present |
Major junctions | |
North end | A 6 in Poligny |
A 19 in Montargis | |
South end | N 7 in Sermoise-sur-Loire |
Location | |
Country | France |
Highway system | |
|
The A77 autoroute is a motorway in central France. The road starts at the hamlet of Rosiers in Seine-et-Marne and finishes to the south of Nevers in Nièvre. It is also known as the l'Arbre - the motorway of the Tree.
It has been designed to minimise its effect on the environment. Each of the rest areas bears the name of a species. The road has been integrated into the landscape helped by zoologists to allow the passage of the animals (wild or cattle) from one side of the road to the other, as in the forest of Montargis. This added to the cost of construction.
Rosiers to Cosne-Cours-sur-Loire
[edit]The motorway is managed by the company the Paris-Rhine-Rhone (SAPRR). It is a toll road with 2x2 lanes and totals 96 km (60 mi).
- Before 1999: The A77 was formed by re-numbering an old motorway connection to the A6 autoroute. The road was the upgraded N7 to Dordives. The toll road follows the valley of the Loing.
- 1999: Opening of the Dordives - Briare section of 68 km (42 mi)
- 2000: Opening of the Briare - Cosne-Cours-sur-Loire section of 33 km (21 mi)
- 2009: Opening of the junction with the A19 autoroute.
Junctions
[edit]This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(December 2021) |
- Exchange A6-A77 Exchanging half between A6 and A77
- 17 (Dordives) 5 km: Towns served: Dordives, Souppes-sur-Loing, Château-Landon, Ferrières-en-Gâtinais
- Exchange A19-A77 Junction with the A19 autoroute
- 18 (Montargis) 28 km: Towns served city Montargis
- 18.1 (Varennes-Changy): Towns served: Varennes-Changy
- 19 (Nogent-sur-Vernisson Gien) to 54 km: Served cities Gien and Nogent-sur-Vernisson
- 20 (Briare) to 67 km: served city Briare
- 21 (Auxerre/Saint-Fargeau) to 80 km: Towns served: Bonny-sur-Loire, Saint-Fargeau 62 km Auxerre
- 22 (Cosne-sur-Loire/Saint-Amand-en-Puisaye) 97 km: Towns served: Cosne-sur-Loire Saint-Amand-en-Puisaye
Cosne-sur-Loire to Nevers-South
[edit]The motorway is managed by the département of Nièvre. It is a free motorway with 2x2 lanes.
- From 1992 to 2004: Phased opening of the section Cosne to Nevers-South
Junctions
[edit]This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(December 2021) |
- 22.1 (Cosne-sur-Loire-centre) 99 km: Towns served: Cosne-sur-Loire
- 23 (Cosne-sur-Loire-Sud) 103 km: Towns served: Cosne-sur-Loire
- 24 (Malataverne) 108 km: Towns Served: Sancerre and Saint-Laurent-l'Abbaye
- 25 (Pouilly-sur-Loire-nord) 108 km: Towns served: Pouilly-sur-Loire which is located pile at the medium between the source and the mouth of the Loire Rest area of Pouilly feel Paris-Province
- 26 (Pouilly-sur-Loire-sud) 112 km: Towns served: Pouilly-sur-Loire
- 27 (Mesves-sur-Loire) 117 km: Towns served: Mesves-sur-Loire
- 28 (Charité-sur-Loire-nord) 119 km: Towns served: La Charité-sur-Loire
- 29 (Charité-sur-Loire-Center) 122 km: Towns served: La Charité-sur-Loire
- 30 (La Marche) 129 km: Towns served: La Marche
- 31 (Pougues-les-Eaux Nord) 136 km: Towns served: Pougues-les-Eaux
- 32 (Varennes-Pougues-les-Eaux) 143 km: Towns served: Pougues-les-Eaux and Varennes-Vauzelles Z.I.
- 33 (Nevers-center) 145 km: Towns served: Nevers Center, Varennes-Vauzelles, Château de la Rocherie
- 34 (Nevers-sud St-Éloi) 150 km: Towns served: Nevers
- 36 (Saint-Éloi) 154 km: Towns served: Saint-Éloi, Decize
- 37 (Nevers-sud)) 158 km: Towns served: Nevers
Nevers to Moulins
[edit]Plans are to extend the motorway to Moulins, with sections already under construction on the existing RN7. The by-pass of Moulins and Villeneuve-sur-Allier has already been completed to autoroute standard. As of December 2022, the plans have not been completed.