A5 motorway (Serbia)
You can help expand this article with text translated from the corresponding article in German. Click [show] for important translation instructions.
|
Autoput A 5 | ||||
---|---|---|---|---|
Serbian: Autoput A5 Serbian Cyrillic: Аутопут А5 | ||||
Route information | ||||
Part of E761 | ||||
Length | 16.5 km (10.3 mi) 112 km (70 mi) planned | |||
Major junctions | ||||
From | Pojate | |||
To | Preljina (Čačak) | |||
Location | ||||
Country | Serbia | |||
Major cities | Kruševac, Kraljevo, Čačak | |||
Highway system | ||||
|
The A5 motorway (Serbian: Аутопут А5, romanized: Autoput A5), called the Morava Corridor (Serbian: Моравски коридор, romanized: Moravski koridor) is a motorway in Serbia under construction and when finished it will span for approximately 112 kilometers (70 mi). It begins in Pojate, north of Kruševac, at the junction with A1 motorway and runs westward to Preljina near Čačak, where it will intersect with A2 motorway. The construction started in December 2019 with the main contractor Bechtel.[1]
Route
[edit]The highway will mostly go through The West Morava Valley, and next to Šumadija District and Pomoravlje District on the northern side, and will connect directly the Rasina District, Raška District and Moravica District /, with combined population of about 760,000 inhabitants. There will be no tunnels, but some 78 bridges are planned on the route.
List of exits
[edit]This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
Nr | km | Name | Route | Places | Note | |
---|---|---|---|---|---|---|
1 | 0 | Pojate | A1 / E75 | Belgrade, Novi Sad, Subotica, Sremska Mitrovica, Kragujevac, Niš | ||
2 | 3 | Ćićevac | 190 | Ćićevac, Varvarin | ||
3 | 20 | Kruševac East | 38 | Kruševac | This exit is planned to be constructed | |
4 | 21 | Kruševac West | 38 | Kruševac | ||
5 | 36 | Velika Drenova | 187 | Rekovac | This exit is planned to be constructed | |
6 | 47 | Trstenik | 23 | Trstenik | This exit is planned to be constructed | |
7 | 58 | Vrnjačka Banja | 23 | Vrnjačka Banja | This exit is planned to be constructed | |
8 | 69 | Vrba | 23 24 |
Kraljevo | This exit is planned to be constructed | |
9 | 75 | Kamidžora | 23 | Kraljevo | This exit is planned to be constructed | |
10 | 82 | Adrani | 22 | Kraljevo, Mataruška Banja, Novi Pazar | This exit is planned to be constructed | |
11 | 97 | Mrčajevci | 22 23 46 24 |
Knić, Kragujevac, A1 / E75 | This exit is planned to be constructed, as well as the interchange for the Gruža corridor | |
12 | 108 | Preljina | 22 23 46 |
Čačak | This exit is planned to be constructed | |
13 | 109 | Preljina | A2 / E763 | Belgrade, Valjevo, Požega, Užice, Sarajevo (Bosnia and Herzegovina), Podgorica (Montenegro) | Currently an exit from A2, planned to be upgraded to interchange. |
References
[edit]- ^ "Works on Morava Corridor to begin on December 15". ekapija.com. Retrieved 10 December 2019.
External links
[edit]