Jump to content

Çağdaş (İzmir Metro)

Coordinates: 38°23′40″N 27°02′43″E / 38.394545°N 27.045412°E / 38.394545; 27.045412
From Wikipedia, the free encyclopedia
Çağdaş
İzmir Metro rapid transit station
General information
LocationBahçelerarası Mah., 35330
Balçova
Coordinates38°23′40″N 27°02′43″E / 38.394545°N 27.045412°E / 38.394545; 27.045412
Owned byİzmir Metropolitan Municipality
Operated byİzmir Metro A.Ş.
Line(s)
  M1
Platforms1 island platform
Tracks2
ConnectionsBus interchange ESHOT Bus: 5, 6, 7, 8, 82, 305, 311, 321, 510, 551, 650, 811, 909, 971, 975, 981, 982, 983, 984, 985, 987
Construction
ParkingNo
Bicycle facilitiesNo
AccessibleYes
History
Opened24 February 2024; 8 months ago (2024-02-24)
Electrified750V DC Third rail
Services
Preceding station İzmir Metro Following station
Dokuz Eylül Üniversitesi Hastanesi
towards Kaymakamlık
M1 Balçova
towards Evka 3

Çağdaş is an underground station on the M1 Line of the İzmir Metro in Balçova. Located under Mithatpaşa Avenue, it has one island platform servicing two tracks. The station was opened on 24 February 2024, after almost 6 years of construction.

History

[edit]

Construction of the seven station expansion of the subway line, west from Fahrettin Altay, began on 9 June 2018 with completion expected by December 2021.[1] Çağdaş was opened on 24 February 2024, along with five other stations on the extension.[2]

Connections

[edit]

ESHOT operates city bus services on Mithatpaşa Avenue.

ESHOT Bus service[3]
Route Number Stop Route Location
5 Teleferik Narlıdere — Üçkuyular İskele Mithatpaşa Avenue
6 Teleferik Arıkent — Üçkuyular İskele Mithatpaşa Avenue
7 Teleferik Sahilevleri — Üçkuyular İskele Mithatpaşa Avenue
8 Teleferik Güzelbahçe — Fahrettin Altay Aktarma Mithatpaşa Avenue
82 Teleferik Siteler — Fahrettin Altay Aktarma Mithatpaşa Avenue
305 Teleferik 2. İnönü Mahallesi — Fahrettin Altay Aktarma Mithatpaşa Avenue
311 Teleferik İnciraltı — Fahrettin Altay Mithatpaşa Avenue
321 Teleferik Çamlı Mahallesi — Fahrettin Altay Aktarma Mithatpaşa Avenue
510 Teleferik Gaziemir — Balçova Mithatpaşa Avenue
551 Teleferik Narlıdere — Fahrettin Altay Aktarma Mithatpaşa Avenue
650 Teleferik Fuar İzmir — Balçova Mithatpaşa Avenue
811 Teleferik Engelliler Merkezi — Montrö Mithatpaşa Avenue
909 Teleferik Zeytinalanı — Fahrettin Altay Aktarma Mithatpaşa Avenue
971 Teleferik Narbel — Fahrettin Altay Aktarma Mithatpaşa Avenue
975 Teleferik Seferihisar — Fahrettin Altay Aktarma Mithatpaşa Avenue
981 Teleferik Balıklıova — Fahrettin Altay Aktarma Mithatpaşa Avenue
982 Teleferik İYTE — Fahrettin Altay Aktarma Mithatpaşa Avenue
983 Teleferik Bademler — Fahrettin Altay Aktarma Mithatpaşa Avenue
984 Teleferik Urla — Fahrettin Altay Aktarma Mithatpaşa Avenue
985 Teleferik Seferihisar — Fahrettin Altay Aktarma Mithatpaşa Avenue
987 Teleferik Ürkmez — Fahrettin Altay Aktarma Mithatpaşa Avenue

Station layout

[edit]
S Street level Exit/entrance, buses
M Mezzanine level Ticket machines, turnstiles
P
Platform level
Westbound M1 (İzmir Metro) toward Kaymakamlık (Dokuz Eylül Üniversitesi Hastanesi)
Island platform, doors will open on the left
Eastbound M1 (İzmir Metro) toward Evka 3 (Balçova)

References

[edit]
  1. ^ "Büyükşehir'den 'milyarlık' yatırım" ['Billion' investment from the Metropolitan] (in Turkish). İzmir Büyükşehir Belediyesi. 10 June 2018. Archived from the original on 14 June 2018. Retrieved 10 June 2018.
  2. ^ "Soyer: 'Bundan sonra sathımız, tüm vatandır'". İzmir Metropolitan Municipality. 24 February 2024. Retrieved 24 February 2024.
  3. ^ "Duraktan Geçen Hatlar". eshot.gov.tr (in Turkish). Retrieved 17 March 2024.
[edit]