Eurasia Continental Bridge corridor
Appearance
(Redirected from Xulan Passenger Dedicated Line)
Eurasia Continental Bridge corridor | |
---|---|
Overview | |
Native name | 陆桥通道 |
Status | Operational |
Owner | China Railway |
Locale | |
Termini | |
Service | |
Type | High-speed rail |
System | China Railway High-speed |
Operator(s) | |
Technical | |
Line length | 3,422 km (2,126 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC (Overhead line) |
Operating speed | 200 to 350 km/h (124 to 217 mph) |
The Eurasia Continental Bridge corridor (simplified Chinese: 陆桥通道; traditional Chinese: 陸橋通道; pinyin: Lùqiáo Tōngdào) is a high-speed rail corridor connecting Lianyungang, a port in northern Jiangsu province, to Ürümqi, the regional capital of Xinjiang. The corridor passes through the cities of Xuzhou (Jiangsu), Zhengzhou (Henan), Xi'an (Shaanxi), Lanzhou (Gansu), and Xining (Qinghai) en route. Announced in 2016 as part of China's "Eight Vertical and Eight Horizontal" network, the rail corridor is an extension of the existing Xuzhou–Lanzhou high-speed railway.
The railway may be considered to be part of the New Eurasian Land Bridge.
Sections
[edit]Section Railway line |
Description | Designed speed (km/h) |
Length (km) |
Construction start date |
Open date |
---|---|---|---|---|---|
Lianyungang–Xuzhou Lianyungang–Xuzhou high-speed railway |
HSR connecting Lianyungang and Xuzhou. | 350 | 180[2] | 2017-08-30 [3] | 2021-02-08[2] |
Xuzhou–Zhengzhou Zhengzhou–Xuzhou high-speed railway |
HSR connecting Xuzhou & Zhengzhou | 350 | 357 | 2012-12-26[4] | 2016-09-10 |
Zhengzhou–Xi'an Zhengzhou–Xi'an high-speed railway |
HSR connecting Zhengzhou & Xian | 350 | 455 | 2005-09-01 | 2010-02-06 |
Xi'an–Baoji Xi'an–Baoji high-speed railway |
HSR connecting Xi'an & Baoji | 350 | 148 | 2009-11-22 | 2013-12-28[5] |
Baoji–Lanzhou Baoji–Lanzhou high-speed railway |
HSR connecting Baoji & Lanzhou | 200 to 250 | 403 | 2012-10[6][7][8] | 2017-07-09 |
Lanzhou-Xinjiang Lanzhou–Xinjiang high-speed railway |
HSR connecting Xinjiang with Lanzhou. | 200 to 250 | 1776 | 2009-11-04 | 2014-12-26 |
Urumqi-Khorgas |
References
[edit]- ^ "3422公里!我国"八纵八横"高铁网"最长一横"即将全线贯通". 2021-02-07. Retrieved 2021-02-07.
- ^ a b "江苏干线铁路完成闭合 连徐高铁2月8日开通运营". 新华网. 2021-02-08. Archived from the original on February 8, 2021. Retrieved 2021-02-08.
- ^ 连徐铁路施工全面展开. 2017-09-08. Archived from the original on 2018-07-07. Retrieved 2018-05-12.
- ^ 郑徐高铁"超计划"动工 郑州将成"米"型高铁枢纽. China News Finance. 2012-12-26. Archived from the original on 2012-12-30. Retrieved 2012-12-31.
- ^ Zhu Ningzhu (28 December 2013). "China's railways mileage tops 100,000 km". Xinhua News Agency. Archived from the original on 5 January 2014. Retrieved 12 July 2014.
- ^ 宝鸡至兰州铁路客运专线建设项目启动. Archived from the original on May 14, 2013. Retrieved 2012-10-21., Xinhua, 2012-10-21
- ^ 宝鸡至兰州客运专线陕西段工程开工建设. Archived from the original on May 14, 2013. Retrieved 2012-10-21., 2012-10-21
- ^ 宝鸡至兰州的客运专线昨天在榆中奠基. Archived from the original on 2015-01-13. Retrieved 2012-10-27.
See also
[edit]