Upper Salmon Hydroelectric Development
Appearance
(Redirected from Upper Salmon Hydro Electric Development)
This article needs additional citations for verification. (November 2024) |
The Upper Salmon Hydro Development is a hydroelectric plant in Newfoundland and Labrador. It utilises a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development.[1]
The plant operates at a normal supply level of 241 m under a net head of 51 metres. The average rated flow of 189.5 m3/s is used to generate 84 megawatts (MW) of electrical power with an average annual production of 541 GWh. The unit, which is equipped with a Francis turbine, was first synchronized on January 19, 1983.
References
[edit]- ^ "Newfoundland electricity plant estimated to cost $155 million". The Calgary Herald. 1979-08-09. pp. C3. Retrieved 2024-10-31.
48°11′00.76″N 56°10′24.25″W / 48.1835444°N 56.1734028°W