Jump to content

Talk:UK railway signalling

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

To do

[edit]

Add mechanical signalling. Add single line working. Add pictures. John 09:25, 26 October 2005 (UTC)[reply]

- but please bear in mind that the term "single line working" refers specifically to the temporary working of all trains over one line of a double track railway, e.g. during failure. It does not refer to the normal working of a single track railway.

Ireland

[edit]

Is railway signalling in Ireland the same as in the UK? Biscuittin (talk) 09:34, 9 September 2008 (UTC)[reply]

Irish signalling is based on British practice, but has evolved slightly differently since the partition. For example, semaphore distant signals still have red arms, mechanical shunting signals are mostly square instead of disc shaped, and the position light shunting signals are different. Colour light signals use the British four-aspect system (but there are no flashing yellows) and the same kinds of route indicators are used. Irish railways have CAWS rather than AWS/TPWS. Banner repeater signals are a fairly recent addition in Ireland. –Signalhead < T > 17:41, 9 September 2008 (UTC)[reply]

Merger proposal

[edit]
The following discussion is closed. Please do not modify it. Subsequent comments should be made in a new section. A summary of the conclusions reached follows.
Identical topics. Merge done. -- P 1 9 9   14:33, 14 March 2014 (UTC)[reply]

I propose that British railway signals be merged into UK railway signalling. I think that the content in the British railway signals article can easily be explained in the context of UK railway signalling, and the British railway signals article is of a reasonable size in which the merging of UK railway signalling will not cause any problems as far as article size or undue weight is concerned.Alanl (talk) 15:29, 4 September 2011 (UTC)[reply]

I agree. Speedbird737 (talk) 18:38, 9 December 2013 (UTC)[reply]
The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.
[edit]

Hello fellow Wikipedians,

I have just modified 2 external links on UK railway signalling. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit User:Cyberpower678/FaQs#InternetArchiveBot*this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, please set the checked parameter below to true or failed to let others know (documentation at {{Sourcecheck}}).

checkY An editor has reviewed this edit and fixed any errors that were found.

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—cyberbot IITalk to my owner:Online 15:31, 15 June 2016 (UTC)[reply]

Although the bot worked correctly, I've replaced the archived links it provided with contemporary ones. This is because all the signalling information that was previously dotted around different rulebook modules has been condensed into the "Signals, handsignals,indicators and signs handbook" and this is the go-to place now. Dr Sludge (talk) 16:09, 7 March 2017 (UTC)[reply]

Railsigns

[edit]

Would some railsigns be aprropriate here? 2006toyotacorrola (talk) 09:04, 31 October 2022 (UTC)[reply]