Jump to content

Florida State Road 589

Route map:
From Wikipedia, the free encyclopedia
(Redirected from Suncoast trail)
State Road 589 marker
State Road 589
Map
SR 589 highlighted in red
Route information
Maintained by Florida's Turnpike Enterprise
Length68 mi[1][2] (109 km)
Major junctions
South end SR 60 in Tampa
Major intersections SR 54 in Odessa
SR 52 near Shady Hills
SR 50 in Spring Hill
US 98 near Sugarmill Woods
North end SR 44 near Lecanto
Location
CountryUnited States
StateFlorida
CountiesHillsborough, Pasco, Hernando, Citrus
Highway system
SR 586 SR 590

State Road 589 (SR 589), also known as the Veterans Expressway and Suncoast Parkway, is a controlled-access toll road near the Florida Gulf Coast.[3][4] Maintained and operated by Florida's Turnpike Enterprise, this 68-mile (109 km) transportation corridor extends from State Road 60 in Tampa, north to State Road 44 near Lecanto. The Veterans Expressway was built to accommodate the increasing commuter traffic in the Tampa-St. Petersburg metropolitan area, with the Suncoast Parkway opening in 2001, extending from near the northern terminus of the Veterans Expressway to U.S. Route 98, with a possible northern extension to U.S. Route 19/U.S. Route 98 in Crystal River in Citrus County in the planning and development stages.[5] As of February 28, 2022, Phase I of the extension is now open between US 98 and Florida State Road 44.[6] Phase II, which would further extend the highway to County Road 486, is undergoing the design phase.[7]

Route description

[edit]

Veterans Expressway

[edit]

The Veterans Expressway extends 15 miles (24 km) from State Road 60 (the Courtney Campbell Causeway) west of Tampa International Airport to Van Dyke Road in northern Hillsborough County. The southern two miles (3 km), between Courtney Campbell Causeway and Hillsborough Avenue (on the west side of Tampa International Airport), upgraded Eisenhower Boulevard to expressway standards with frontage roads, is tolled when entering southbound from Hillsborough Avenue, and when exiting northbound onto Hillsborough Avenue, else not tolled. North of Hillsborough Avenue, the remaining 13 miles (21 km) are tolled.

Interchange construction in November 2008. The ramp from southbound SR 589 to Tampa International Airport opened in September 2008. Note that the southbound exit is now numbered as "1B".

Between Courtney Campbell Causeway and Van Dyke Road, intermediate interchanges are provided at Independence Parkway, Memorial Highway, Hillsborough Avenue, Waters Avenue, Anderson Road, Linebaugh Avenue/Wilsky Boulevard, Gunn Highway, Ehrlich Road, Hutchison Road and Dale Mabry (known as the spur). There are two mainline SunPass gantries (Anderson and Sugarwood) and six ramp plazas.[8][9] The Veterans Expressway converted to all-electronic, cashless tolling in 2014. Drivers must have a SunPass or they will be billed with TOLL-BY-PLATE. The "N minus 1" formula is used for multiaxle vehicles on all Turnpike facilities except for the ticket system on the Turnpike mainline and the T ramp on the I-4 Connector. N minus 1 may be calculated by counting the number of axles, minus 1, times the passenger car toll rate at each plaza.

Suncoast Parkway

[edit]

The 55-mile-long Suncoast Parkway (SR 589) proceeds north from the Veterans Expressway to SR 44 in Citrus County, Florida, near Lecanto.[10]

The Suncoast Parkway was the first Florida's Turnpike Enterprise toll road to feature open road tolling.[11] The three mainline toll plazas on the Suncoast Parkway originally featured bypasses where those paying cash remained on the mainline and stopped at the toll plaza while those with a SunPass or related transponder exited the mainline roadway, bypassed the toll plaza and then re-entered the mainline. This differed from later open road tolling locations in Florida where transponder users remained on the mainline to bypass toll booths built or moved to the side of mainline traffic.[11][12]

The mainline tolling stations on the Suncoast Parkway were closed at 7 PM local time on January 31st, 2020,[13][14] making SR 589 a cashless toll road for its entire length.

Suncoast Trail

[edit]
Scenic view along the upper portion of trail
J.B. Starkey Wilderness Trail

As part of the Suncoast Parkway project, a multi-use paved recreational trail called the Suncoast Trail was constructed parallel to the western side of the highway, and opened along with the Parkway itself in 2001.[15] The trail begins at Lutz-Lake Fern Road (Exit 16), and continues north for 55 miles (89 km) to the highway's terminus at State Road 44. Four miles north of State Road 54, an additional 6.5-mile paved bicycle trail connects the Suncoast Trail to the J. B. Starkey Wilderness Park in New Port Richey. Use of the Suncoast Trail is free, but in late 2010, a $2.00 parking fee was implemented at the Lutz-Lake Fern trailhead (Hillsborough County). At the same time, Pasco County implemented a parking fee, but it was rescinded in late 2017. Motor vehicles are prohibited along the entire trail, except for Park Rangers, and other authorized vehicles.

The Suncoast Trail bridge over SR 50 with the Suncoast Parkway in the background

For most of its length, the Suncoast Trail stays close to the parkway, separated by fences, grass, and in some places concrete barriers. Bridges that cross rivers and streams were built with enough width to accommodate trail users. Where roads cross above the parkway, particularly north of State Road 52, the trail briefly strays from the parkway, allowing users to cross the intersecting road at-grade.

Pedestrian and cyclist crossing of minor cross streets is regulated by posted signs. At busier intersections, pedestrian crossing signals are part of the traffic signal systems already in place. The notable exception is at the State Road 50 interchange near Brooksville, where a dedicated overpass has been constructed to cross State Road 50, approximately 500 feet (150 m) west of the main parkway.

Tolls

[edit]

The Veterans Expressway is an all-electronic toll road and does not accept cash. It ceased cash collection in June 2014.[16]

The Suncoast Parkway was the first of Florida's Turnpike Enterprise expressways to feature open-road tolling when it opened in 2001. However, unlike roads that were later converted into open-road tolling, the SunPass transponder users must turn their vehicle onto an off-ramp while cash users stay on the main highway route at toll plazas. During a resurfacing project in 2012-2013, the lanes were reconfigured, and signage modified, to give the outer SunPass lanes the appearance of being the primary route. Access to the booths on the inner part of the roadway, was reduced to a single lane.[citation needed]

Toll rates were adjusted statewide on October 29, 2017.[17] In January 2020, the Suncoast Parkway stopped accepting cash payment of tolls, converting fully to SunPass and Toll-By-Plate.[18]

History

[edit]

Veterans Expressway

[edit]

The Veterans Expressway is the north-south portion of what was the Northwest Hillsborough Expressway, originally proposed in the 1960s as the northwest beltway around Tampa's outer limits. As the plans finalized, the communities along the route grew, leading to rising land costs and opposition to the expressway dividing the towns. Lutz was especially vocal, eventually rallying state politicians to cancel the expressway construction altogether. By the mid-1980s, the expressway was broken in two segments, the Veterans Expressway and the Lutz Expressway. In the early 1990s, the Tampa-Hillsborough Expressway Authority began to build the Veterans Expressway, but was depleted of funds, leading to Florida's Turnpike Enterprise purchasing the right of way using the existing design to complete construction of the expressway. State Road 589 was designated the Veterans Expressway in 1992 and was completed in October 1994.[citation needed]

From its opening in 1994, the Veterans Expressway saw very little changes in its roadway configuration. When the Suncoast Parkway was constructed in 1998 (through 2001), the Van Dyke Road interchange was reconfigured.[citation needed]

Former sections

[edit]

With the completion of the Suncoast Parkway in 2001, the stub of the Veterans Expressway from Exit 13 to Dale Mabry Highway was designated State Road 568.[citation needed]

Originally, State Road 589 was concurrent with State Road 60 between Exit 2A and Exit 1, then extended to West Spruce Street and Boy Scout Boulevard. These roads were re-designated as SR 616.[citation needed]

South of the southern terminus, SR 589 was planned to be branched off onto the West Crosstown Expressway and become part of the Lee Roy Selmon Expressway, at the Selmon Expressway's Exit 4. The West Crosstown was canceled due to a freeway revolt, and the SR 589 and SR 449 designations were eliminated from the Lee Roy Selmon Expressway.[citation needed][citation needed]

Suncoast Parkway

[edit]
Former north end of SR 589 at US 19-98

Construction began on the Suncoast Parkway in 1998, and opened in 2001 in two stages at a cost of $507 million. The section from the Veterans Expressway to State Road 50 opened in February 2001[19] and the section from State Road 50 north to U.S. Route 98 opened in August 2001.[20]

Tampa Airport interchanges

[edit]
Construction of the flyover that now carries traffic from Tampa International Airport to I-275 north and SR 60 east

In August 2005, a massive reconstruction project began on the interchanges between I-275 and Memorial Highway, near Tampa International Airport after being shelved for over fifteen years.[citation needed] The project consisted of a four-level stack interchange at the Spruce St Interchange, a three-level interchange at the Courtney Campbell Causeway, and an extensive auxiliary exit ramp system stretching from Independence Pkwy to just north of I-275. The first phase, dealing with the northbound lanes to the airport was completed on March 31, 2010, at a cost of $202 million.[21] The second phase, which upgrades the southbound lanes, is currently in the early design stages and there is currently no timetable set for construction.[citation needed]

Interchange construction in early 2008; the flyovers from SR 589 south to TIA, SR 589 south to SR 616 (Spruce St), and TIA to I-275 south during construction

The project has resulted in better access from southbound Veterans Expressway to the Courtney Campbell Causeway on State Road 60, the Airport to I-275 and the WestShore Business District.[22] According to the Florida Department of Transportation, the tallest flyover is 2,096 feet (639 m) long and 75 feet (23 m) high at its peak.[23]

Tampa Airport interchange exit facing north.

As of August 2007 video cameras have been added on the road every 10th of a mile down the span of the toll road.[citation needed]

Widening of the Veterans Expressway, All-Electronic Tolling, and Express Lanes

[edit]

This improvement project, which began May 2013, widens 11 miles (17.7 km) of the Veterans Expressway between Memorial Hwy and Van Dyke Rd. The improvements, which are divided into five separate projects, double the capacity of the highway from four to eight lanes. Part of the widening improvements include reconstruction of 38 existing bridges and the building of three new bridges.

The widening project also includes a concurrent project to convert the section from Memorial Highway to Van Dyke Road to all-electronic tolling (AET) providing non-stop travel. In addition, the conversion of the Suncoast Parkway to AET will occur concurrent with the expansion into Citrus County,[24] thereby providing enhanced benefits to drivers using the entire Toll 589 corridor. The project introduces Express Lanes (also known as Managed Lanes) to the region. A congestion management tool (which is already in place along parts of I-95 and I-595 in Miami), Express Lanes offer motorists a choice that provides an opportunity for a faster through-trip, with greater trip reliability and safety. All-Electronic tolling is being implemented in segments while the widening project continues. This latter process began in June, 2014.

The new Linebaugh southbound on-ramp opened in early summer 2015. The Anderson Road exit was reconstructed to accommodate widening the mainline roadway under the bridge. The southbound on-ramp opened in spring 2015, with the northbound off-ramp following by early summer. On the night of June 13, 2014, the segment between Memorial Highway and Gunn Highway converted to All-Electronic Toll Collection.[25] On September 5, 2014, the segment between Gunn Highway and Hutchison Road was converted.[26]

On December 9, 2017, the first phase of the Express Lanes, between Gunn Hwy and Hillsborough Ave, opened to traffic. The lanes will not be subjected to the variable rate toll until closer to the time that the second phase from Gunn Hwy to Dale Mabry opens.[27]

While the reconstruction of the Veterans wrapped up in 2018, the Florida's Turnpike Enterprise still has not activated variable tolling for the express lanes. As of October, 2021, the agency is converting the lanes to general purpose "Thru Lanes", similar to that of portions of the Beachline Expressway. Lane dividers will remain intact, but signage will change to reflect the conversion.[28]

Future

[edit]

Suncoast Parkway extension

[edit]

A planned expansion project of the Suncoast Parkway will feature a 13-mile extension from US 98 to State Road 44 in Citrus County, providing the Parkway's extension into that county.[29]

The project follows a northerly route, paralleling US 19 and CR 491. Three interchanges are proposed: completion of the US 98 interchange, a new interchange at Cardinal Road and a partial interchange at SR 44. The extension will be an all-electronic, cashless toll facility.[citation needed]

The extension will be implemented under two separate projects to be let as design-bid-build contracts in 2016. Estimated project costs are $135 million, opening on February 28, 2022.[29]

The original expansion plans featured an additional 15-mile extension from SR 44 to US 19; however, this portion remains unfunded with no timetable for its beginning.[26]

Intersecting Roadway Notes
US 98 (current northern terminus) Four alignments are proposed for this interchange
Cardinal Street Four alignments are proposed for this interchange
SR 44 Three alignments are proposed for this interchange
CR 495 (North Citrus Avenue) One alignment is proposed for this interchange
US 19 / US 98 One alignment is proposed for this interchange

Possible Extension towards Jacksonville

[edit]

FDOT is currently evaluating the possibility of further extending the Suncoast Parkway to create a seamless, limited access, tolled highway between Tampa and Jacksonville. The highway would be able to connect to I-75 either near the Ocala/Gainesville area, or near Lake City, then possibly I-10, the First Coast Expressway, and/or I-95 as it enters the Jacksonville metro area. Currently, those wishing to make a trip between Tampa and Jacksonville can use I-4 to I-95, I-75 to I-10, or various surface roads such as U.S. 301.[30]

Criticism

[edit]

The Suncoast Parkway (both the existing route and the newly opened extension) has raised criticism from several opponents.

Citrus County residents believe that the extension would disrupt the quiet, undisturbed sections of Citrus County and bring forth more urban sprawl to the county. Furthermore, impacted residents fear that the parkway alignments come too close to their residences and will cause excessive noise and decreased property values.

Historic preservation groups oppose the extension as the planned alignment would essentially wipe out the Etna Turpentine Camp Archeological Site, which is on the National Register of Historic Places.[31] In addition, a planned alignment threatens an underground water supply for the Homosassa Special Water District.[32]

Furthermore, the toll estimates for the original Suncoast Parkway have fallen far below expectations (actual revenues USD$22M vs. USD$150M estimated), leading Tampa Bay Times columnist Craig Pittman to ask why an extension is needed on a road that has had far fewer users than planned.[31]

Exit list

[edit]
CountyLocationmi[1][2]kmExitDestinationsNotes
HillsboroughTampa0.0000.000

SR 60 east to I-275 – Tampa, St. Petersburg
SR 589 north splits from SR 60 west here, but SR 589 south merges with SR 60 east at exit 2A
0.2150.3461A Tampa International Airportsouthbound exit and northbound entrance
0.2360.3801B SR 616 (Spruce Street) – Raymond James Stadiumsouthbound exit and northbound entrance
0.9181.4772A
SR 60 west – Clearwater
north end of SR 60 east overlap (southbound only)
1.8132.9182BIndependence Parkwaynorthbound exit and southbound entrance
2.1553.4683 CR 576 (Memorial Highway)northbound exit is accessed by remaining on SR 60 west at the beginning of SR 589. Southbound Express Lanes end here.
Town 'n' Country3.1235.0264 SR 580 (Hillsborough Avenue)Northbound Express Lanes begin just north of here. Electronic tolling northbound exit and southbound entrance
5.1678.3156A CR 584 (Waters Avenue)Electronic tolling northbound exit and southbound entrance
5.7769.2966BAnderson RoadNorthbound exit and southbound entrance. Reconstructed in 2016. Electronic tolling
Anderson/Linebaugh Toll Gantry (Local Lanes: $1.07 with SunPass, $1.34 with Toll-By-Plate. Express Lanes: Variable rates are subject to traffic conditions at peak usage. [33]
Citrus Park6.73410.8377Linebaugh AvenueNorthbound exit and southbound entrance. Reconstructed in 2016.
7.33211.8008Linebaugh Avenue via Wilsky BoulevardSouthbound exit and northbound entrance. Reconstructed in 2014. Electronic tolling
Express Lanes Entrance/ExitAccessible in both directions.
8.82314.1999 CR 587 (Gunn Highway)Electronic tolling southbound exit and northbound entrance
9.76615.71710Ehrlich Road
Sugarwood Toll Gantry (Local Lanes: $1.07 with SunPass, $1.34 with Toll-By-Plate. Express Lanes: Variable rates are subject to traffic conditions at peak usage. [33]
Northdale11.69918.82812Hutchison RoadNorthbound Express Lanes end just north of here. Southbound Express Lanes begin just north of here. Future phases will allow the lanes to extend northward onto the Suncoast Pkwy. Electronic tolling southbound exit and northbound entrance
13.21821.27213
To SR 597 (Dale Mabry Highway) (via SR 568 east)
northbound exit and southbound entrance
13.90222.37314 CR 685A (Van Dyke Road)Electronic tolling southbound exit and northbound entrance
Keystone15.96425.69216 CR 582 (Lutz Lake Fern Road)opened August 15, 2009[34][35]
PascoOdessa18.42129.64619 SR 54 – New Port Richey, ZephyrhillsAccess to Medical Center of Trinity; electronic tolling northbound exit and southbound entrance
21.234.1Anclote Toll Gantry
24.940.125 CR 524 (Ridge Road)Northbound exit and southbound entrance opened December 31, 2021; interchange opened fully on March 17, 2022; electronic tolling on northbound entrance and southbound exit; full interchange with access to complete Ridge Road Extension to US-41 by FY 2025.
28.23845.44527 SR 52 – San Antonio, Dade City, New Port RicheyAccess to Regional Medical Center Bayonet Point
Shady Hills32.051.5Spring Hill Toll Gantry
PascoHernando
county line
37.01759.57337 CR 578 (County Line Road)Access to Bayfront Health Spring Hill; electronic tolling southbond exit and northbound entrance
HernandoSpring Hill40.47065.13041 CR 574 – Spring Hill, Airport
44.23271.18546 SR 50 – Brooksville, Weeki WacheeAccess to Bayfront Health Brooksville; electronic tolling northbound exit and southbound entrance
49.279.2Oak Hammock Toll Gantry
54.73088.07955 US 98 (SR 700) – Crystal RiverFormer northern terminus of the Suncoast Parkway until February 28, 2022
Citrus5792Sugarmill Toll Gantry
609760 CR 482 (W Cardinal Street)
65105Lecanto Toll Gantry
67.5108.668 SR 44 – Crystal River, InvernessExit number not signed; current northern terminus of the Suncoast Parkway Extension
Proposed Toll Gantry
71 CR 486Will be part of the Suncoast Parkway Extension Phase 2 to start construction in FY 2023
Proposed Toll Gantry
76 CR 495Will be part of the Suncoast Parkway Extension Phase 3A to start construction in FY 2026
Proposed Toll Gantry
81 US 19 / US 98 (SR 55) – Crystal River, ChieflandWill be part of the Suncoast Parkway Extension Phase 3B; proposed northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ a b FDOT Interchange Report Archived February 8, 2012, at the Wayback Machine, accessed March 2014
  2. ^ a b FDOT straight line diagrams Archived March 6, 2014, at the Wayback Machine, accessed March 2014
  3. ^ "Florida's Turnpike - System Description - Toll 589 - The Veterans Expressway/Suncoast Parkway". Archived from the original on September 22, 2010.
  4. ^ "Veterans Expressway/Suncoast Parkway" (PDF). Archived from the original (PDF) on September 22, 2010.
  5. ^ "Suncoast Parkway 2". Archived from the original on 2008-05-13. Retrieved 2008-05-31.
  6. ^ "Suncoast Parkway 2, Phase 1". Retrieved 2021-10-12.
  7. ^ "Suncoast Parkway 2, Phase 2". Retrieved 2021-10-12.
  8. ^ "Please redirect your browser to the new URL on AARoads". www.southeastroads.com.
  9. ^ "Florida @ SouthEastRoads - Florida 589 South - Veterans Expressway". Archived from the original on January 30, 2010.
  10. ^ "Florida @ SouthEastRoads - Florida 589 North - Suncoast Parkway". Archived from the original on January 27, 2010.
  11. ^ a b Suarez, Evelio; Hoeflich, Kevin (May–June 2005). "The End of The Tollbooth?" (Magazine). Public Roads. 68 (6). Federal Highway Administration. FHWA-HRT-05-005. Retrieved 13 October 2024.
  12. ^ Turnbell, Michael (6 March 2008). "SunPass finally easing traffic flow at Florida toll plazas". TCPalm. South Florida Sun-Sentinel. Retrieved 13 October 2024.
  13. ^ Behrendt, Barbara (29 January 2020). "Cash toll booths close Friday on the Suncoast Parkway". Tampa Bay Times. Retrieved 13 October 2024.
  14. ^ WFTS Digital Staff (31 January 2020). "Suncoast Parkway to go cashless". ABC Action News. Retrieved 13 October 2024.
  15. ^ "Office of Greenways and Trails - Florida Department of Environmental Protection". www.dep.state.fl.us.
  16. ^ Morelli, Keith (11 June 2014). "Toll booths about to vanish on Veterans Expressway in Hillsborough". The Tampa Tribune. Tampa, FL. Archived from the original on 2015-04-14. Retrieved 2017-11-29.
  17. ^ "Florida Turnpike Toll Calculator v5.1". www.floridasturnpike.com. Retrieved 2017-11-29.
  18. ^ Behrendt, Barbara (January 29, 2020). "Cash toll booths close Friday on the Suncoast Parkway". Tampa Bay Times. Tampa, FL. Archived from the original on January 29, 2020. Retrieved February 21, 2021.
  19. ^ DeWitt, Dan (28 January 2001). "SUNCOAST PARKWAY: ROAD TO THE FUTURE // Driven by a vision". St. Petersburg Times. Retrieved 13 October 2024. The stretch of the parkway due to open Feb. 4 will run 32 miles from the Veterans Expressway in northern Hillsborough County to State Road 50 in Hernando County.
  20. ^ Konrad, Mike (30 July 2001). "Last Hernando stretch of parkway set to open". St. Petersburg Times. Retrieved 13 October 2024. The Suncoast Parkway between State Road 50 and U.S. 98 in northern Hernando County will open Aug. 11, bringing the expressway to within a short distance of the Citrus County line. A ribbon-cutting will take place Aug. 10 just south of the U.S. 98 terminus, the Florida Department of Transportation Turnpike District announced. At 8 a.m. the following day, the 10-mile stretch of the four-lane highway will open to traffic.
  21. ^ "Your source for information on FDOT projects the Tampa Bay Area". www.mytbi.com.
  22. ^ "New bridge opens for traffic at Tampa airport". Archived from the original on December 25, 2007.
  23. ^ "Your source for information on FDOT projects the Tampa Bay Area". www.mytbi.com.
  24. ^ Censullo, Meredyth (16 April 2013). "Veterans Expressway widening and conversion to all-electronic tolls begins April 21". Archived from the original on 14 July 2014. Retrieved 14 June 2014.
  25. ^ "Veterans Expressway tolls to start going cashless". www.baynews9.com.
  26. ^ a b "Veterans Expressway goes cashless (10 News Saint Petersburg; September 5, 2014)". Archived from the original on 2014-09-07.
  27. ^ Johnson, Caitlin (December 8, 2017). "Express lanes set to open on Veterans. They're free -- for now". Tampa Bay Times.
  28. ^ "Veterans Expressway". Retrieved 2021-10-12.
  29. ^ a b "Suncoast Parkway 2, Phase 1". Florida's Turnpike. Retrieved 2021-06-06.
  30. ^ "New toll road would link Tampa and Jacksonville".
  31. ^ a b "Getting it wrong: Suncoast Parkway set to expand even as it fails to meet projections". 5 February 2016.
  32. ^ "Homosassa water supplier fears new Suncoast leg will pollute its well field". 5 February 2016.
  33. ^ a b "Veterans Expressway & Suncoast Parkway Toll Map - Florida's Turnpike/FDOT" (PDF). www.floridasturnpike.com. Archived from the original (PDF) on 2019-07-13. Retrieved 2019-01-27.
  34. ^ "A new interchange at Lutz-Lake Fern Road for the Suncoast Parkway is set to open Saturday". Archived from the original on 2011-06-07. Retrieved 2009-08-12.
  35. ^ "New interchange opens on Suncoast Parkway".[permanent dead link]
[edit]
KML is not from Wikidata

Media related to Florida State Road 589 at Wikimedia Commons