Jump to content

East Bayfront LRT

From Wikipedia, the free encyclopedia

East Bayfront LRT
Overview
StatusPlanned
LocaleToronto, Ontario
Termini
Service
TypeStreetcar
SystemToronto streetcar system
Operator(s)Toronto Transit Commission
Technical
Track gauge4 ft 10+78 in (1,495 mm) – TTC gauge
Route map

Union
Queens Quay
509/510 to Spadina
Freeland Street
Richardson Street
Lower Sherbourne Street
Parliament Street
Queens Quay
Cherry Street
Queens Quay
Keating Channel
Centre Street
Cherry Street
Commissioners Street
New Munitions Street
Villiers Island Loop

East Bayfront LRT, also known as the Waterfront East LRT, is a planned[1][2] Toronto streetcar line that would serve the East Bayfront and Port Lands areas in Toronto, Ontario, Canada. It would run from Union station under Bay Street and along Queens Quay and Cherry Street to a new loop along Commissioners Street east of Cherry Street on Ookwemin Minising.[3] It would complement the existing 509 Harbourfront service that connects Union Station to Queens Quay west of Bay Street. Longer-term plans are to extend the East Bayfront line from Cherry and Commissioners Streets to the planned East Harbour Transit Hub along GO Transit's Lakeshore East line and the planned Ontario Line.[4]: 55 

The Waterfront East LRT Extension is a City of Toronto project to develop the East Bayfront LRT. The project involves both Waterfront Toronto and the Toronto Transit Commission. The proposed line is part of the Waterfront Transit Network which also includes the Waterfront West LRT.[4]

By April 2023, the project's design was nearing 30 percent completion.[5]: 10  If the design is approved, the line could partially open along Queens Quay East between 2030 and 2033 but with Union Station bypassed. The project could fully open sometime between 2032 and 2035.[5]: 73 

Route

[edit]

The proposed line would start at the underground loop at Union Station and proceed underground in the existing streetcar tunnel under Bay Street to Queens Quay. The line would then turn east and emerge from the tunnel on Queens Quay just west of Yonge Street. The line would continue east to a relocated Cherry Street,[6]: 55  where it would turn south to Commissioners Street then east on Commissioners Street to terminate at a new loop running via New Munitions, Centre and Villiers Park Streets – all new streets to be constructed on Ookwemin Minising. All tracks for the new line east of the Bay Street tunnel would be in a dedicated right-of-way.[3]

Platform and track configurations
image icon Existing Union station platform
image icon Proposed Union station platforms

As part of the project, the underground streetcar stations at Union Station and Queens Quay would be expanded. At Union Station, the existing streetcar platform at the head of the loop would be replaced by four new platforms, more specifically two platforms along each side of the loop's neck under Bay Street. Also along the neck, there would be two bypass tracks and switchwork so that any streetcar entering the station or leaving a platform could bypass any other streetcar waiting at a platform.[5]: 11–16  On the south side of Queens Quay station, there would be a double-track wye junction to replace the existing curve. From Queens Quay station, southbound streetcars would be able to branch either east or west along Queens Quay. Streetcars could also continue along Queens Quay, bypassing Queens Quay station.[5]: 26  A new tunnel portal would be constructed on Queens Quay on the west side of Yonge Street.[5]: 30  Both the eastbound and westbound tracks would be in a dedicated right-of-way along the south side of Queens Quay so as to reduce the need for rail vehicles to stop for road traffic as there are fewer street intersections on the south side of Queens Quay than on its north side.[7]

Waterfront Toronto is constructing Ookwemin Minising, an island in the Port Lands, by creating a new channel for the Don River south from the Keating Channel then turning west to run between Commissioners Street and the Ship Channel into Toronto Harbour. The island is to be redeveloped from industrial to mixed commercial and residential use.[8]: 25  Streetcar service for the island is planned on reserved right-of-ways which may initially be used by buses.[8]: 62  The streetcar right-of-way would be on the east side of a relocated Cherry Street.[8]: 63 

Bridge to Villiers Island, designed to carry streetcars on a relocated Cherry Street[9]

As of April 2023, the plan was to implement the new line in two stages. The first stage would be to build the line along Cherry Street and Queens Quay East and connect the tracks to those on Queens Quay West at Bay Street. Streetcars would run from the Port Lands to possibly Exhibition Loop. The streetcar tunnel under Bay Street would then be closed to enlarge the Union Station loop and Queens Quay station. When the tunnel reopens, streetcars would run from Union Station to the Port Lands.[8]: 53 

Besides building the streetcar line along Queens Quay East, the city ultimately wants to connect Ookwemin Minising precinct to the 504 King streetcar route via its Cherry Street branch. As a first phase, the city feels it could either build along Queens Quay or connect to the 504 King, but not both simultaneously. Thus, the city prefers to build the Queens Quay trackage first before making the 504 King connection.[5]: 73 

Cost

[edit]

In 2015, the estimated cost to build the East Bayfront LRT from Union Station to Small Street was $520 million. The breakdown was as follows:[10][11]

  • Building a new eastbound passenger platform at Union Station: $112 million
  • Extension of Bay Street tunnel to Freeland Street: $156 million
  • Surface infrastructure: $66 million
  • Rolling stock: $36 million
  • Queens Quay revitalization: $150 million

By June 2019, the estimated cost of the line had grown to $700 million.[12] The above costs do not reflect design changes to Queens Quay station or the planned extension of the line from Parliament Street to Ookwemin Minising, changes which were proposed in 2021.[6]

By October 2023, the cost had risen to $2.57 billion broken down as: $932 million for Union Station Loop, $1.3 billion to connect Union Station to Ookwemin Minising, and $337 million to connect lower Cherry Street to Distillery Loop in a separate phase.[13]: 16, 17 

Challenges

[edit]

The underground streetcar loop at Union Station does not have the capacity to accommodate the extra light rail vehicles needed to service the new line. Thus, a new eastbound platform must be added.[14]

A sewer at Queens Quay and Bay Street will make it difficult to build an eastern portal to bring the tracks to the surface.[14]

One of the issues which has delayed progress of constructing the line is the proposed redevelopment of the waterfront properties between Jarvis Street and Parliament Street, which lie south of Queens Quay. The plans called for two access streets, which would cross the proposed light rail line at signalized intersections. However, the developer has designed a third street into the plan, likely due to the expected traffic volumes from the development, which would require an additional signalized intersection with the light rail line. Some councillors have stated this would negatively affect service along the proposed route, possibly adding as much as an extra three minutes travel to a line that would only require ten minutes to traverse.

Demand

[edit]

George Brown College's campus in the East Bayfront has opened and there are development plans for several apartment and condominium complexes on Queens Quay East and, in future years, in the West Don Lands. Thus, there will be roughly 20,000 residential units in the area, plus 8,000 jobs and 3,500 students.[14]

According to transit advocate Steve Munro, developers in the area, particularly for commercial properties, are concerned that without good transit, a better connection to the core area than the Sherbourne and Bay buses, developments are not marketable.[15]

A project called the Waterfront Transit Reset was set up to study possible streetcar system upgrades along the waterfront from Long Branch to Leslie Street. That study included the East Bayfront. A WTR report dated November 13, 2017, stated that:

While three bus routes currently serve the area, adding higher-quality, higher-capacity streetcar service is an urgent priority for the TTC, the City, and Waterfront Toronto. Projected peak demand in 2041 on this section is approximately 2400 people per hour, and serving this very high level of demand requires high-quality streetcar service in a dedicated right of way.[16]

In January 2019, the Waterfront BIA (a neighbourhood business group) estimates a $1.2 billion loss of productivity and a $20 billion loss of federal, provincial and local tax revenue if the opening of the East Bayfront LRT were delayed from 2025 to 2045. The BIA hopes that the line will open by 2025 which according to the BIA would stimulate commercial and residential development providing 135,000 new jobs and housing 67,000 residents along the proposed line.[17]

Alternatives to streetcar operation

[edit]

The City of Toronto considered a bus service running in the former streetcar's dedicated right-of-way. The challenge for such a service to the eastern waterfront is the connection at Union Station for transferring passengers. There is limited sidewalk space for both pedestrians and transit stops along Bay Street. Buses would have to compete with other traffic through the Bay Street underpass and mixed traffic south to Queens Quay.[18]

The City also considered replacing the streetcar track in the 400-metre (1,300 ft) tunnel under Bay Street between Union Station and Queen's Quay with a driverless people-mover system; this option also included changing the streetcar routing so it only ran along Queen's Quay.

In April 2019, staff recommended continuing streetcar operation under Bay Street to Union Station, along with extending platforms and adding extra tracks along the Union Station streetcar loop.[19]

History

[edit]

On April 5, 2006, the first Public Forum for the Environmental Assessment for the Eastern Waterfront transit proposals was held.[20]

In February 2012, Emily Jackson of the Toronto Star reported that budget over-runs on the Queens Quay West line had not left enough funds to start the Queens Quay East line.[18][21]

On August 29, 2014, The Globe and Mail reported that senior City of Toronto officials had gone over the head of City Council, and made an appeal for funding for the line right to more senior levels of government.[22][23] TTC General Manager Andy Byford and City Manager Joe Pennachetti had made their proposal to their opposite numbers in the Provincial bureaucracy. According to The Globe and Mail, they had not yet approached provincial and federal politicians.[citation needed]

In September 2015, the TTC Budget Committee passed the following motion regarding the Capital Budget:

Request TTC staff, working with the City of Toronto manager, and Waterfront Toronto, to prioritize the East Bayfront LRT project, and to report back to the TTC's Budget Committee on how to expedite the work, starting with the planning and engineering work.[15]

In May 2016, condominium developers expressed concern about a lack of activity on the East Bayfront LRT project. Sam Crignano, president of Cityzen, a developer with three projects along the eastern waterfront, said that having two or three bus lines in the area won't be enough to handle the future influx of new residents and employees. Niall Haggart, executive vice-president of the Daniels Corp., urged action on the LRT project. Daniels has started a $700-million mixed-use development which will add about 7,300 people to the area by day and 2,500 at night. The Toronto Star reported that the project had been stalled because of a lack of funding and piecemeal transportation planning.[24]

A report about the Waterfront Transit Reset project dated November 13, 2017, stated that: "The City, Waterfront Toronto, and the TTC would carry out the approved plans for a new streetcar line along Queens Quay East [to Parliament Street] in the East Bayfront area."[16]

Since the provincial election of June 2018, when there was a change in government, the province has made no promise to fund the Easy Bayfront LRT. In January 2019, the provincial Ministry of Transportation said it had not received a formal request for funding from the City; thus, the province remains uncommitted.[17]

In June 2019, Sidewalk Labs offered $100 million in "credit support" to build a portion of the East Bayfront LRT between Cherry Street and Broadview Avenue, which would pass through its proposed development in Toronto's Portland area. The estimated cost of that portion of the line was $406 million and would be in addition to the $700 million estimated cost to build the line from Union Station to Small Street.[12]

On June 17, 2020, the TTC Board approved spending $15,000,000 over three years on design work for the expansion of streetcar platforms at Union and Queens Quay stations as well for a new tunnel and portal for the East Bayfront line. The TTC was also considering connecting the line to Distillery Loop.[25]

At a virtual public meeting held on June 21, 2021, it was announced that in phase 1, the LRT line would terminate in the Port Lands at a new Polson Loop near Cherry and Polson Streets. A new loop at Parliament Street was rejected as a terminus because of crowding by existing buildings. Distillery Loop was problematic because of construction of the Ontario Line and because grading problems would require a temporary loop elsewhere. A Polson Loop would also support development in the Port Lands, while a Parliament Loop or Distillery Loop would not.[6]: 56 

In January 2023, Waterfront Toronto announced design changes so that a new on-street loop on Ookwemin Minising would be the eastern terminal of the line instead of Polson Loop. The streetcar line would be extended a short distance on Commissioners Street and then loop on a dedicated right-of-way via New Munitions Street, Centre Street and Villiers Park Street – all new streets to be constructed. A loop would help serve the planned mixed-use community and future parks to be built on the island. A new Polson Loop would remain in plans for future expansion.[3]

An October 2023 city report recommended that a streetcar connection along Cherry Street between Lakeshore Boulevard East and Distillery Loop be delivered as a separate contract in a later phase because constructing such a link may conflict with Ontario Line construction and the planned Gardiner Expressway realignment.[26]: 4, 14 

Future expansion

[edit]

In a later phase, there could be a branch running east from Cherry Street along Commissioners Street that, halfway to Leslie Street, would turn north to the planned East Harbour Transit Hub, with connections to GO Transit trains, the planned Ontario Line and a possible southerly extension of the streetcar line along Broadview Avenue.[4]: 28 [8]: 63 [6]: 55  A November 2017 report about the Waterfront Transit Reset project stated that projected demand east to Leslie Street (150 people per hour in 2041) was too low to justify streetcar service further east.[16]

See also

[edit]

References

[edit]
  1. ^ "Waterfront East Light Rail Transit". City of Toronto. October 12, 2021. Archived from the original on April 19, 2023. Retrieved April 19, 2023.
  2. ^ "Extending the Waterfront East LRT to Villiers Island | Waterfront Toronto". www.waterfrontoronto.ca. Archived from the original on February 8, 2023. Retrieved April 19, 2023.
  3. ^ a b c "Extending the Waterfront East LRT to Villiers Island". Waterfront Toronto. January 25, 2023. Archived from the original on January 27, 2023.
  4. ^ a b c "Waterfront East LRT Extension – Transit Network Update" (PDF). City of Toronto. February 17, 2021. Archived (PDF) from the original on February 4, 2021. Retrieved February 19, 2021.
  5. ^ a b c d e f "Waterfront East LRT Extension – Virtual Public Consultation #3" (PDF). City of Toronto. April 2023. Archived (PDF) from the original on April 7, 2023.
  6. ^ a b c d "Waterfront East LRT – Virtual Consultation – Summer 2021" (PDF). City of Toronto. June 21, 2021. Archived (PDF) from the original on June 21, 2021. Retrieved June 22, 2021.
  7. ^ Mackenzie, Robert (April 10, 2010). "Queens Quay Transit Project: Will Help Renew Toronto's Waterfront". Transit Toronto. Archived from the original on October 21, 2011. Retrieved December 24, 2011. Transit is a key component — or quay component — of the plan. Two lanes of streetcar tracks will separate the pedestrian and cycling area from the roadway. Since these tracks will line the southern side of the traffic portion of Queens Quay, streetcars will cross fewer side streets and stop only at intersections, with signals prioritizing streetcars over other vehicles. And streetcars will also start to serve eastern harbour — the area between Bay and Parliament Streets.
  8. ^ a b c d e "Villiers Island Precinct Plan" (PDF). Waterfront Toronto. September 2017. Archived (PDF) from the original on October 31, 2020. Retrieved October 28, 2020.
  9. ^ Ian Harvey (September 25, 2020). "Big steel bridges now floating towards Toronto's waterfront". Daily Commercial News. Archived from the original on May 16, 2021. Retrieved February 22, 2021. The bridges are the first of up to seven eventually planned for the east Toronto waterfront area around Cherry Street where the Don River mouth diversion is well underway. The single span Cherry Street North bridge is engineered to handle LRT loads but since there's no transit line there yet, it will easily handle buses.
  10. ^ Simcoe, Luke (October 28, 2015). "Toronto hits the 'reset' button on waterfront transit planning". Metro News. Archived from the original on March 5, 2016. Retrieved October 31, 2015.
  11. ^ Munro, Steve (October 14, 2015). "A "Reset" For Waterfront Transit Plans?". Archived from the original on October 14, 2015. Retrieved November 1, 2015.
  12. ^ a b Spurr, Ben (June 24, 2019). "Sidewalk Labs says it won't pay upfront costs for new LRT critical to 'smart city' waterfront development". Toronto Star. Archived from the original on June 24, 2019. Retrieved June 24, 2019.
  13. ^ "Advancing Waterfront East Light Rail Transit" (PDF). City of Toronto. October 17, 2023. Archived (PDF) from the original on November 4, 2023.
  14. ^ a b c Morrow, Adrian (May 25, 2012). "A tiny perfect streetcar line is being laid along Cherry Street". The Globe and Mail. Archived from the original on June 30, 2012. Retrieved July 19, 2012.
  15. ^ a b Munro, Steve (September 17, 2015). "TTC Budget 2016: Confused Priorities Make For A Confusing Budget (Part I)". Archived from the original on September 17, 2015. Retrieved September 17, 2015.
  16. ^ a b c "Waterfront Transit Update" (PDF). Toronto Transit Commission. November 13, 2017. Archived from the original (PDF) on January 28, 2018. Retrieved November 13, 2017.
  17. ^ a b Spurr, Ben (January 30, 2019). "Delaying Waterfront LRT would cost billions in lost tax revenue, productivity: BIA report". Toronto Star. Archived from the original on January 30, 2019. Retrieved January 30, 2019.
  18. ^ a b Munro, Steve (February 8, 2013). "Waterfront East Update: February 2013 (Updated)". Steve Munro. Archived from the original on March 4, 2015. When a transit line to the eastern waterfront was first proposed, the cost estimate was considerably lower than today. Waterfront Toronto has only $90-million left in the account for this project because some of the originally intended funds have been redirected to the Queens Quay West project now underway.
  19. ^ "Waterfront Transit Network - Union Station-Queens Quay link and east Bayfront LRT" (PDF). City of Toronto. April 19, 2019. Archived (PDF) from the original on April 20, 2019. Retrieved April 19, 2019. Based on the analysis described in this attachment, the recommended preferred option is the Streetcar (Loop Expansion) Option.
  20. ^ Munro, Steve (April 6, 2006). "East Waterfront Update". Archived from the original on March 4, 2016. Retrieved November 1, 2015.
  21. ^ Jackson, Emily (February 14, 2012). "Toronto LRT transit plan stalling on Queens Quay East". Toronto Star. Archived from the original on March 4, 2016. But the LRT project meant to connect Union Station with the burgeoning lakefront community to its east seems to have gone off the rails just a year and a half after the government gave it a stamp of approval.
  22. ^ Moore, Oliver; Hains, David (August 29, 2014). "Toronto bureaucrats bypass politicians to make waterfront transit pitch". The Globe and Mail. Archived from the original on August 29, 2014. Retrieved August 29, 2014. Two of Toronto's top bureaucrats are pushing for a new light-rail line right across the city's waterfront, taking to higher levels of government their pitch for a route expected to cost hundreds of millions.
  23. ^ Sweet, Sarah (August 29, 2014). "Bureaucrats Take the Fight for Waterfront LRT Straight to Higher Levels of Government". Torontoist. Archived from the original on August 29, 2014. The route they're championing would involve the East Bayfront LRT—mentioned in the last provincial budget but by no means a done deal—and the Waterfront West LRT, part of former mayor David Miller's now-defunct Transit City plan. It would create an east-west transit option that could relieve congestion on the Gardiner Expressway and Lake Shore Boulevard and provide an easier way for those in Liberty Village to get downtown.
  24. ^ Spurr, Ben (May 23, 2016). "Amid development boom, Queens Quay East LRT running late". Toronto Star. Archived from the original on May 23, 2016. Retrieved May 23, 2016.
  25. ^ "Waterfront East LRT, Union Station and Queens Quay Link" (PDF). Toronto Transit Commission. June 17, 2020. Archived from the original (PDF) on June 20, 2020. Retrieved June 20, 2020.
  26. ^ "Waterfront East LRT: Constructability Assessment Summary – Attachment 3" (PDF). City of Toronto. October 17, 2023. Archived (PDF) from the original on November 4, 2023.
[edit]