Portal:London transport/Selected articles/38
High Speed 1, officially known as the Channel Tunnel Rail Link, is a 108-kilometre (67-mile) high-speed railway line running from London through Kent to the British end of the Channel Tunnel.
When the Channel Tunnel was opened, Eurostar trains ran on standard commuter tracks through Kent and south London to Waterloo International, running at speeds much below their maximum due to speed limits and competing rail traffic. High Speed 1 was constructed to provide a dedicated fast route between the tunnel and London and was constructed and opened in two sections.
The first section of the line was opened in September 2003 and ran from the tunnel to North Kent where trains transferred from the high speed tracks to the Kent and South London commuter network to run to Waterloo International. The second section of the line, travelling under the River Thames and into London St Pancras, opened on 14 November 2007. Built at a cost of £5.2bn, the link allows trains to travel at speeds of 300 kilometres per hour (186 mph), cutting pre-2003 Eurostar journey times by 40 minutes and increasing service frequency. It is now possible to travel from London St Pancras to Paris Gare du Nord in 2 hours 15 minutes, and to Brussels South in 1 hour 51 minutes. Domestic high speed commuter services from Kent to St Pancras started in December 2009 running at speeds of up to 225 kilometres per hour (140 mph). (Full article...)