From Wikipedia, the free encyclopedia
(Redirected from Nova-C)

Nova-C lunar lander
Odysseus in preparation for launch
ManufacturerIntuitive Machines
DesignerIntuitive Machines
Country of originUnited States
OperatorIntuitive Machines
ApplicationsLunar payload delivery and support
Specifications
Spacecraft typeLunar lander
BusNova-C bus
Launch mass1,900 kg (4,200 lb)[1]
Payload capacity100 kg (220 lb)[2]
Power200 W (0.27 hp)[2]
Design life14 days after landing
Dimensions
Length3 m (9.8 ft) [3]
Diameter2 m (6 ft 7 in) [3]
Production
StatusIn production
On order4
Built2
Launched1
Retired1
Maiden launch01:05 a.m. EST, 15 February 2024[4]
Related spacecraft
Derived fromProject Morpheus[2]
Additional flight information
Launch vehicle Falcon 9 Block 5
Avg. cost per spacecraft $118 million US[5]
Proximate missions
Last mission IM-1
Last mission launch date 15 February 2024[6]
Next mission IM-2
Next mission launch date January 2025 (or after)[7]

The Intuitive Machines Nova-C, or simply Nova-C, is a class of lunar landers designed by Intuitive Machines (IM) to deliver small payloads to the surface of the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.[8] The IM-1 lunar lander, named Odysseus (pronounced /əˈdɪsiəs/ ə-DISS-ee-əs), was launched by a SpaceX Falcon 9[6] rocket on 15 February 2024, reached lunar orbit on 21 February, and landed on the lunar surface on 22 February. This marked the inaugural Nova-C landing on the Moon and the first American spacecraft to perform a soft landing on the Moon in over 50 years.[9][10] It is the first spacecraft to use methalox propulsion to navigate between the Earth and the Moon.

The second Nova-C lander with the IM-2 mission is scheduled to launch no earlier than January 2025,[7] and a third Nova-C lander on the IM-3 mission is scheduled for no earlier than October 2025.[11] SpaceX is under contract to provide Falcon 9 launches for each of the three landers.[12][13][14][15]

Funding

[edit]

In 2017, Space Policy Directive 1 signaled the intention of returning NASA astronauts to the Moon.[16] NASA documents obtained by The New York Times suggested the agency would involve the private spaceflight sector in the effort.[17] In 2018, NASA solicited bids from nine companies, including Intuitive Machines, for the Commercial Lunar Payload Services (CLPS) program.[18] CLPS is part of the NASA Artemis program; one of the long term goals of Artemis is establishing a permanent crewed base on the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.[8]

In 2021, Intuitive Machines received a NASA contract that was initially valued at US$77 million to conduct lunar landings for NASA.[19] After contract modifications, the total contract value came to US$118 million in 2024.[5]

Overview

[edit]

Structure

[edit]

The lander structure is a hexagonal cylinder with six landing legs and is 3.938 m (12.92 ft) tall. It has a launch mass of 1,908 kg (4,206 lb) and can hold a payload of 100 kg (220 lb).[2][20]

Propulsion

[edit]
Nova-C Class lander model on display

Nova-C was developed by Intuitive Machines, inheriting technology from NASA's Project Morpheus. Its gimbaled VR900 main engine uses methane and oxygen as liquid propellants. Pressurized by helium gas, the engine produces 3,100 N (700 lbf) of thrust.[21] For attitude[a] control the vehicle uses a helium reaction control system (RCS).[22] Each thruster in the RCS produces 4.45 N (1 lbf) of thrust. At launch Nova-C is filled with 845 kg (1,863 lb) of liquid oxygen, 422 kg (930 lb) kg of liquid methane and 17 kg (37 lb) of gaseous helium.[23][24] Propellant is loaded onto Nova-C at the launch pad alongside propellant loading of the launch vehicle.[25] Use of liquid methane and liquid oxygen is believed to be an enabling technology for future deep space missions. Propellants aboard the lander were stored in composite over-wrap liner-less cryogenic tanks. Thermodynamic venting systems provide cryogenic cooling.[26]

Electric power

[edit]

Nova-C landers use solar panels as a source of electrical power. Most areas of the lunar surface are sunlit during lunar days, which last approximately fourteen Earth days.

Electrical power is generated by a photovoltaic system with three solar panels, a top deck panel and two body panels, generating a combined maximum of 200 W on the lunar surface. A 25 amp-hour battery supplies power to a 28 VDC bus for use by the spacecraft when power generation lags consumption.[23]

Communications

[edit]

Nova-C is capable of 24/7 data coverage for its client payloads[2]

Landing

[edit]

The lander is designed to stay upright when landing on a slope of up to 10 degrees.[27] The lander includes autonomous landing and hazard detection technology and once landed is still capable of relocating itself to a second landing site by performing a vertical takeoff, cruise, and vertical landing.[2][1]

Missions

[edit]

Intuitive Machines is conducting the first three Nova-C missions for the NASA Commercial Lunar Payload Services program.[19] The landers are tasked with delivering small science and technology-development payloads.[28]

IM-1 mission

[edit]

The lander for the first Nova-C mission, IM-1, was named Odysseus.[29][30] A contract for the mission was signed in 2021, with later modifications.[5] The mission launched 15 February 2024 on a Falcon 9 launch vehicle and landed with a "rough"[citation needed] - soft landing on 22 February 2024 in the South Pole region of the moon, approximately at 80.13° South latitude and 1.44° East longitude, inside a shallow 1 km diameter crater with a 12° slope. The lander came to rest about 1.5 km away from the intended landing site near the Malapert A crater. The line of approach brought Odysseus in from the northeast over Schomberger crater. Upon initial contact with the lunar surface, the lander broke a leg off of the hexagonal body, and bounced back along the line of approach, with the main engine and RCS firing to null out vertical and lateral velocities. After landing vertically, the lander slowly settled onto the lunar surface with the top solar array pointed in the general direction of Schomberger crater. One of the rectangular arrays, originally intended to be vertical, is on top and angled 30° with the horizontal, or about 18° with the lunar surface. [9][31][32][33][34] IM announced that until entering standby mode on February 29, 2024, Odysseus had transmitted over 350 megabytes of science and engineering data from all payloads, and it will try to revive Odysseus during the next lunar day.[35]

Odysseus's "rough" - soft Moon landing is the first soft landing of any kind for an American made spacecraft since Apollo 17, more than 50 years ago, and the first by a private company.[36][37] The soft Odysseus landing also qualifies the Odysseus mission as the first liquid methane and liquid oxygen (methalox) powered spacecraft to fire beyond low earth orbit, as well as the first methalox spacecraft to land on an off-world celestial body.[38]

After the landing Odysseus was resting on the surface at a 30° angle with the horizontal.[citation needed] It has been confirmed by Tim Crain, CTO of Intuitive Machines, that one of the landing leg struts broke off during the landing, and that the lander is resting on a helium tank and/or a computer shelf that was strapped outside of the main fuselage. Based on telemetry received by mission controllers Odysseus appeared in "good health." The antennas were not vertically aligned as initially planned, and transmissions from the lander were somewhat reduced. Both science and engineering data were received from the lander. It was hoped that a data link could be restored with Odysseus after lunar sunrise occurs at Malapert A crater, although this was not a requirement of the mission, On March 23 Intuitive Machines announced that Odysseus would not wake up and that the mission had ended [39][40][41]

Odysseus touched down on the Moon in the middle of a lunar day, and was expected to remain functional for approximately six Earth days (until February 27), when the cold lunar night will set in and the solar panels will no longer be able to supply power.[42][34] IM engineers announced that they may be able to maintain communication with Odysseus for an additional 10 to 20 hours after the sun has gone down over the Odysseus landing site, due to Odysseus's battery capacity. It was also announced that the Odysseus data feed back to Earth has been sending back payload related science data as well as images. [43]

IM and NASA held a joint press conference on February 28 to discuss and review the IM-1 mission.[44]

IM-2 mission

[edit]

IM was selected in October 2020 in order to land its second Nova-C lander near the lunar south pole. As of September 2024, IM-2 is expected to be launched no earlier than January 2025.[7] In May 2024, the company shared IM-2 entered into its final assembly stage.[45] The primary payload, PRIME-1, includes the TRIDENT ice drill to sample ice from below the lunar surface and the MSolo mass spectrometer to measure the amount of ice in the samples.[46][47]

ILO-1 prime contractor Canadensys is working to deliver "a flight-ready low-cost optical payload for the ILO-1 mission, ruggedized for the Moon South Pole environment". It could potentially be ready for integration on the IM-2 mission.[48]

The μNova (Micro-Nova) Hopper will separate from the Nova-C lander after landing and function as a standalone hopper lander, exploring multiple difficult-to-reach areas such as deep craters on the lunar surface.[49][50]

A lunar communications satellite will be deployed on this mission to facilitate communications between the lander and ground stations on Earth.[50]

Spaceflight will deliver rideshare payloads on this mission aboard its Sherpa EScape (Sherpa-ES) space tug called Geo Pathfinder.[51][52]

The MiniPIX TPX3 SPACE payload, provided by the Czech company ADVACAM, will be onboard the Nova-C lunar lander. This payload is designed to monitor the radiation field on the Moon and help understand how to protect crew and equipment from the negative effects of cosmic rays. This marks the first Czech payload planned to be delivered to the Moon's surface.[53][54]

Space technology company Lunar Outpost will send their first lunar rover, the Mobile Autonomous Prospecting Platform (MAPP), on this mission in a partnership with Nokia Bell Labs and IM. MAPP will collect lunar samples for NASA under a contract worth just $1, which is symbolic of a new incentive for the emerging commercial space industry to access resources in space.[55][56] Photos of the samples and other data will be transmitted through radio equipment and antennas to communicate with the Nova-C lander.[57][58]

A collaboration in order to demonstrate 4G cellular connectivity, in partnership with Nokia Bell Labs and NASA will be aboard the lander.[59] Nokia's equipment is a Network-In-a-Box and will connect the Nova-C lander with Lunar Outpost's MAPP rover and IM's Micro-Nova Hopper. This 4G/LTE network will provide more bandwidth than the more conventional ultra-high frequency (UHF) systems used for space communication. Nokia says they hope that future missions will use shared infrastructure to interlink bases on the lunar surface.[60]

IM-3 mission

[edit]
CADRE ATLO Team presents completed rovers

NASA selected a Nova-C mission for CLPS task order CP-11.[61] It will deliver payloads to the lunar swirl in the Reiner Gamma region.[62] In August 2021, Intuitive Machines selected SpaceX to launch its third lunar mission, IM-3.[13] As of August 2024, the launch of IM-3 is expected to take place no earlier than October 2025.[11][63] The lander will conduct experiments investigating the properties of the unexpected magnetic field that has been detected in the vicinity of the Reiner Gamma swirl.[64]

The Reiner Gamma landing site was announced for the first PRISM opportunity and the JHU Applied Physics Laboratory's Lunar Vertex payload was selected to conducted a detailed scientific analysis of the surface and surface environment. David Blewett (APL) is the principal investigator and leads the science team. Lunar Vertex includes payload elements on the Nova-C lander (APL magnetometer, SwRI plasma spectrometer, and Redwire camera arrays) and on a Lunar Outpost rover (APL magnetometer and Canadensys microscopic imager). APL also provided overall management, systems engineer, SMA, and rover integration and testing.[65]

Additional IM-3 payloads include the Cooperative Autonomous Distributed Robotic Explorers (CADRE) rovers, ESA's MoonLIGHT Pointing Actuator (MPAc) and KASI's Lunar Space Environment Monitor (LUSEM).[61]

IM-4 mission

[edit]

IM-4 was announced and awarded by NASA in September 2024 for a launch in 2027.[66]

IM-C1 mission

[edit]

Intuitive Machines have indicated that they are working on a 'commercial' mission, named IM-C1.[26]

Further Nova-C missions

[edit]

The Nova-C lander was designed to be compatible with methane and oxygen fuel sources that are believed to be available on both the Moon and on Mars. For future missions, methane and oxygen could potentially be "harvested" wherever the Nova-C lander may be based using In-situ resource utilization (ISRU) (off-world resource processing technologies).[67][68] The Nova-C lander technology platform can be scaled up to mid and large lander classes, capable of accommodating larger payloads.[28]

Successors

[edit]

Nova-D

[edit]

In an interview with NASA recorded in October 2023, Tim Crain, CTO of Intuitive Machines, mentioned the possible development of a Nova-D lander.[69] Early reports of the in-development Nova-D state that it will use two of the VR-900 engines and be capable of carrying more than 500 kg to the lunar surface.[70]

In August 2024, Intuitive Machines proposed a mission to deliver NASA's VIPER rover to the Moon on a Nova-D lander no earlier than late 2027.[11]

Nova-M

[edit]

Intuitive Machines is developing another lander, the Nova-M which, according to early reports, will use two VR-3500 engines originally developed for Boeing and their HLS to carry 5,000 kg to the lunar surface.[70]

See also

[edit]
Other commercial lunar lander programs
Lunar lander programs by country

Notes

[edit]
  1. ^ attitude here refers to orientation of the spacecraft

References

[edit]
  1. ^ a b Berger, Eric (3 May 2021). "For lunar cargo delivery, NASA accepts risk in return for low prices". Ars Technica. Archived from the original on 3 May 2021. Retrieved 3 May 2021.
  2. ^ a b c d e f Nova-C Lunar Lander Archived 1 December 2018 at the Wayback Machine Intuitive Machines Accessed on 28 May 2019
  3. ^ a b Houston company among 9 tapped to build moon landers Archived 2018-12-01 at the Wayback Machine Alex Stuckey, The Houston Chronicle. Retrieved 30 November 2018.
  4. ^ Status of Nova C (IM-1) Launch Time Archived 19 January 2023 at the Wayback Machine Next Spaceflight. 6 February 2024. Retrieved 7 February 2024.
  5. ^ a b c Final preparations underway for launch of first Intuitive Machines lunar lander Archived 25 February 2024 at the Wayback Machine Spacenews.com. By Jeff Foust. February 1, 2024. Retrieved February 20, 2024.
  6. ^ a b Machines, Intuitive (15 February 2024). "IM-1 Mission Nova-C Lunar Lander Successfully Enroute to the Moon Following its launch on SpaceX's Falcon 9". Intuitive Machines. Archived from the original on 25 February 2024. Retrieved 25 February 2024.
  7. ^ a b c David, Leonard (12 September 2024). "Ice-hunting Lunar Trailblazer and IM-2 nearly ready for January 2025 launch". SpaceNews. Retrieved 12 September 2024.
  8. ^ a b "Houston-based Intuitive Machines to be among first private U.S. companies to land on the moon". Houston Chronicle. 5 June 2019. Archived from the original on 1 February 2022. Retrieved 22 January 2024.
  9. ^ a b Chang, Kenneth (22 February 2024). "A U.S.-Built Spacecraft Lands on the Moon for the First Time Since 1972". The New York Times. Archived from the original on 23 February 2024. Retrieved 23 February 2024.
  10. ^ "Odysseus becomes first US spacecraft to land on moon in over 50 years". CNN. 22 February 2024. Archived from the original on 23 February 2024. Retrieved 23 February 2024.
  11. ^ a b c Foust, Jeff (13 August 2024). "Intuitive Machines seeks to take over NASA's VIPER lunar rover". SpaceNews. Retrieved 13 August 2024.
  12. ^ "Intuitive Machines' first lunar lander mission slips to 2022". SpaceNews. 28 April 2021. Archived from the original on 25 February 2024. Retrieved 30 April 2021.
  13. ^ a b "Three-peat: Intuitive Machines Selects SpaceX Falcon 9 Rocket for Third Moon Mission". Intuitive Machines. 10 August 2021. Archived from the original on 12 February 2022. Retrieved 10 August 2021.
  14. ^ "One Giant Leap". Columbia. 19 February 2022. Archived from the original on 24 February 2022. Retrieved 24 February 2022.
  15. ^ Etherington, Darrell (13 April 2020). "Intuitive Machines picks a launch date and landing site for 2021 Moon cargo delivery mission". TechCrunch. Archived from the original on 28 July 2020. Retrieved 24 April 2021.
  16. ^ Chang, Kenneth (11 December 2017). "Trump Announces That the Moon Is Astronauts' Next Destination". The New York Times. Archived from the original on 4 April 2023. Retrieved 22 February 2024.
  17. ^ Chang, Kenneth (11 February 2018). "NASA Budgets for a Trip to the Moon, but Not While Trump Is President". The New York Times. Archived from the original on 25 December 2023. Retrieved 22 February 2024.
  18. ^ "NASA Announces New Partnerships for Commercial Lunar Payload Delivery Services". nasa.gov. NASA. 29 November 2018. Archived from the original on 25 November 2020. Retrieved 29 November 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  19. ^ a b Houston-based aerospace company lands $77.5 million deal with NASA for 2024 moon mission Archived 6 February 2024 at the Wayback Machine Intuitivemachines.com. Nov. 23, 2021. Retrieved Feb. 5, 2024.
  20. ^ "PRIME-1". NASA. Archived from the original on 3 October 2023. Retrieved 6 February 2024.
  21. ^ Intuitive Machines, LLC (23 April 2021). "Application of Intuitive Machines, LLC". FCC. Archived from the original on 12 February 2024. Retrieved 22 January 2024.
  22. ^ IM-1 Mission Summary (pg 8) Archived 13 February 2024 at the Wayback Machine Intuitive Machines. By Josh Marshall. Dec. 31, 2023. Retrieved February 13, 2024.
  23. ^ a b Morales Volosín, Juan (11 February 2024). "IM-1, Nova-C "Odysseus"". Everyday Astronaut. Archived from the original on 11 February 2024. Retrieved 12 February 2024.
  24. ^ Gilliland, Tyler. ""our LOx/LCH4 numbers are in fact swapped in our proposal."".
  25. ^ Foust, Jeff (4 October 2023). "First Intuitive Machines lunar lander ready for launch". SpaceNews. Archived from the original on 23 February 2024. Retrieved 11 December 2023.
  26. ^ a b "NASA, Intuitive Machines Moon Mission Update". YouTube. Archived from the original on 28 February 2024. Retrieved 28 February 2024.
  27. ^ Chang, Kenneth (4 March 2024). "Why It's So Challenging to Land Upright on the Moon". The New York Times. Archived from the original on 5 March 2024. Retrieved 5 March 2024.
  28. ^ a b Intuitive Machines Headed To The Moon In 2021 Archived 2019-06-02 at the Wayback Machine Space Mining News 30 November 2018
  29. ^ "SpaceX gearing up to launch Intuitive Machines private moon lander in February". Space.com. 31 January 2024. Archived from the original on 19 February 2024. Retrieved 1 February 2024.
  30. ^ "SpaceX gearing up to launch Intuitive Machines private moon lander in February". Space.com. 31 January 2024. Archived from the original on 19 February 2024. Retrieved 1 February 2024.{{cite web}}: CS1 maint: bot: original URL status unknown (link) Space.com. By Mike Wall. Jan. 31, 2024. Retrieved Feb. 5, 2024.
  31. ^ Intuitive Machines Livefeed: Odysseus makes soft landing Archived 22 February 2024 at the Wayback Machine Intuitivemachines.com. February 22, 2024. Retrieved February 22, 2024.
  32. ^ Privately built lunar lander makes history with successful moon touchdown Archived 22 February 2024 at the Wayback Machine NBCNews.com. By Denise Chow. February 22, 2024. Retrieved February 22, 2024.
  33. ^ NASA’s LRO Images Intuitive Machine’s Odysseus Lander Archived 26 February 2024 at the Wayback Machine Nasa.gov. February 26, 2024. Retrieved February 26, 2424.
  34. ^ a b Sideways moon landing cuts mission short, private US lunar lander will stop working Tuesday Archived 26 February 2024 at the Wayback Machine Quartz/ qz.com. By Marcia Dunn. February 26, 2024. Retrieved February 26, 2024.
  35. ^ Intuitivemachines.com news update February 29, 2024 Archived 1 March 2024 at the Wayback Machine Retrieved March 1, 2024.
  36. ^ Dunn, Marcia (4 January 2024). "Two companies will attempt the first US moon landings since the Apollo missions a half-century ago". AP. Archived from the original on 5 February 2024. Retrieved 5 February 2024.
  37. ^ "Falcon 9 Block 5 - Nova C (IM-1)". Next Spaceflight. 19 December 2023. Archived from the original on 19 January 2023. Retrieved 20 December 2023.
  38. ^ Intuitive Machines Press Release Archived 16 March 2024 at the Wayback Machine Mindsviewpress. By Steve Altemus. February 28, 2024. Retrieved February 29, 2024.
  39. ^ Sriram, Akash; Varghese, Harshita; Roulette, Joey (23 February 2024). "Intuitive Machines shares descend fast after the CEO says the moon lander is on its side". Reuters. Retrieved 23 February 2024.
  40. ^ Watch live: NASA, Intuitive Machines share updates on Odysseus moon lander Archived 28 February 2024 at the Wayback Machine USAtoday.com. By Emily DeLetter. February 28, 2024. Retrieved February 28, 2024.
  41. ^ https://twitter.com/Int_Machines/status/1771609255616909738 [bare URL]
  42. ^ IM-1, Nova-C “Odysseus” Archived 11 February 2024 at the Wayback Machine By Juan I. Morales Volosín. February 11, 2024. Retrieved February 11, 2024.
  43. ^ Lunar Surface Day Five Update Archived 22 February 2024 at the Wayback Machine Intuitivemachines.com. February 27, 2024. Retrieved February 27, 2024.
  44. ^ NASA, Intuitive Machines Moon Mission Update February 28, 2024 Archived 1 March 2024 at the Wayback Machine Retrieved March 1, 2024.
  45. ^ https://twitter.com/Int_Machines/status/1787845786916528621. {{cite web}}: Missing or empty |title= (help)
  46. ^ "NASA – NSSDCA – Spacecraft – Details". Archived from the original on 24 May 2022. Retrieved 18 July 2022.
  47. ^ Brown, Katherine (16 October 2020). "NASA Selects Intuitive Machines to Land Water-Measuring Payload on the Moon". NASA. Archived from the original on 18 October 2020. Retrieved 15 November 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  48. ^ "The ILO Mission – ILOA Hawai'i". 7 April 2021. Archived from the original on 3 November 2021. Retrieved 22 September 2023.
  49. ^ "Lunar Services – Getting Around – Extreme Lunar Surface Mobility". Intuitive Machines. Archived from the original on 28 June 2021. Retrieved 22 June 2021.
  50. ^ a b "Intuitive Machines to Deploy and Operate First Lunar Communication Satellite in 2022". Intuitive Machines. 21 June 2021. Archived from the original on 21 June 2021. Retrieved 22 June 2021.
  51. ^ "IM-2 South Pole Mission Adds Secondary Rideshare Spaceflight Inc". Intuitive Machines. 18 August 2021. Archived from the original on 18 August 2021. Retrieved 18 August 2021.
  52. ^ "Spaceflight Inc announces rideshare mission to the moon and geostationary orbit". nasaspaceflight.com. 15 September 2021. Archived from the original on 14 September 2021. Retrieved 15 September 2021.
  53. ^ "Advacam – MiniPIX TPX3 Space". Archived from the original on 1 November 2023. Retrieved 2 November 2023.
  54. ^ "LSU's Tiger Eye-1 to Monitor Radiation Environment in Deep Space". Archived from the original on 6 July 2022. Retrieved 2 November 2023.
  55. ^ Johnson, Arianna (9 November 2022). "MIT Will Return To The Moon For The First Time Since Apollo, Thanks To This Space Startup". Forbes. Retrieved 30 April 2024.
  56. ^ Thorbecke, Catherine (5 December 2020). "NASA will pay a firm $1 to go to the moon and get a sample". ABC News. Retrieved 30 April 2024.
  57. ^ "An inside look at Nokia's Moon mission - images". Nokia. Retrieved 30 April 2024.
  58. ^ "An inside look at Nokia's Moon mission". Nokia. 25 July 2023. Retrieved 30 April 2024.
  59. ^ Bantock, Jack (24 April 2024). "Streaming and texting on the Moon: Nokia and NASA are taking 4G into space | CNN Business". CNN. Retrieved 27 April 2024.
  60. ^ Waldek, Stefanie (30 April 2024). "Private moon lander will carry Nokia's 4G cell network to the lunar surface this year". Space.com. Retrieved 30 April 2024.
  61. ^ a b "NASA Payloads for (CLPS PRISM) CP-11 – Intuitive Machines Nova-C Lander". NASA. Archived from the original on 27 February 2024. Retrieved 3 March 2024.
  62. ^ "NASA Selects Intuitive Machines to Deliver 4 Lunar Payloads in 2024". Intuitive Machines. 17 November 2021. Archived from the original on 3 October 2023. Retrieved 17 November 2021.
  63. ^ "NASA Selects Intuitive Machines for New Lunar Science Delivery". NASA (Press release). 17 November 2021. Archived from the original on 17 November 2021. Retrieved 17 November 2021.
  64. ^ NASA Selects Intuitive Machines for New Lunar Science Delivery Archived 17 November 2023 at the Wayback Machine By Karen Fox et. al. Nov.17, 2021. Retrieved February 9, 2024.
  65. ^ "Lunar Vertex: Solving Mysteries Swirling Around the Moon's Magnetic Regions | Johns Hopkins University Applied Physics Laboratory". www.jhuapl.edu. Retrieved 3 July 2024.
  66. ^ "CLPS Flight: Intuitive Machines (IM-4) - NASA". Retrieved 3 September 2024.
  67. ^ "Innovative Partnership Tests Fuels of the Future". NASA. 13 October 2009. Archived from the original on 17 September 2011. Retrieved 3 March 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  68. ^ Nasa's new Mars landing craft Morpheus bursts into flames on take-off The Telegraph 10 August 2012
  69. ^ "IM-1, Houston We Have a Podcast". NASA. 9 February 2024. Archived from the original on 13 February 2024. Retrieved 9 February 2024.
  70. ^ a b Neal, Mihir; Kanayama, Lee (13 August 2021). "Intuitive Machines adds third mission following first lunar landings in 2022". NASASpaceFlight.com. Archived from the original on 23 February 2024. Retrieved 23 February 2024.