MILDEN project
Appearance
(Redirected from MİLDEN)
The MILDEN project (Turkish: Milli Denizaltı Projesi; English: National Submarine Project) is a multi-year military design and procurement project to develop indigenous air-independent power attack submarines, intended to be commissioned into the Turkish Navy in the 2030s. MILDEN is being designed in the Gölcük Naval Shipyard, where concept design was completed in 2022, and the "preliminary design phase, in which the main and auxiliary systems [will be] elaborated in detail" began in September 2022.[1]
As of August 2022[update], Turkey planned to start construction of the first submarine in 2025. MILDEN is a diesel-electric submarine of approximately 2,700 tonnes displacement, and somewhat over 80 metres (260 ft) in length.[1]
See also
[edit]Notes
[edit]- Bilgen, Mustafa Emir (2023-04-05). "Milli Denizaltı (MİLDEN) Projesi". Mavi Vatan (in Turkish). Retrieved 2024-11-05.
- "MİLDEN Projesinde Test Bloğu İnşasına Mart Ayında Başlanılması Bekleniyor". www.defenceturkey.com. Retrieved 2024-11-05.
- "MİLDEN Denizaltısının program takvimi açıklandı" (in Turkish). 2023-04-14. Retrieved 2024-11-05.