Jump to content

Line SFMA

From Wikipedia, the free encyclopedia
Line A
Overview
Service typeCommuter rail
StatusOperational
LocaleMetropolitan City of Turin
First service9 December 2012
Current operator(s)Gruppo Torinese Trasporti
Route
TerminiTorino DoraDora
Ceres
Stops20
Technical
Rolling stockMinuetto
Track gauge1,435 mm (4 ft 8+12 in)
Track owner(s)Turin Metropolitan Railway Service
Route map
Ceres
Mezzenile
Pessinetto
Losa
Traves
Funghera
Germagnano
Lanzo
Balangero
Mathi
Villanova-Grosso
Nole
San Maurizio
Caselle Aeroporto Turin Airport
Caselle
Borgaro
Venaria
Rigola-Stadio
Madonna di Campagna
Torino Dora
Torino Porta Susa
 1  2  4  6  7 

Line SFM2 is part of the Turin Metropolitan Railway Service. It links Turin (at Dora GTT station) via Turin Caselle airport, Venaria Reale and nearby Allianz Stadium. The line was opened on 9 December 2012.[1]

Future development

[edit]

A railway tunnel is planned to be built under Corso Grosseto, a major east-west artery in the city, to link the current Turin-Ceres line with Porta Susa station. The duration of the construction is estimated to be three years, but will happen in stages to minimise impact on local residents and business owners. Once completed, the 2.7 km (1.7 mi) long tunnel will include its own underground station, which will replace the current Madonna di Campagna station. Two overpasses on Corso Grosseto will be demolished, and replaced by a signalled intersection. In order to reduce traffic, a 400-metre (1,300 ft) underpass will also be built under Largo Grosseto.[2]

On 14 December 2017 the demolition of the Corso Grosseto overpasses was halted due to the discovery of asbestos within the structure. This could delay the demolition work by two months.[3]

References

[edit]
  1. ^ "La Stampa". Archived from the original on 2012-09-15.
  2. ^ "Torino-Ceres, svelati i dettagli del progetto che rivoluzionerà la città: costi, tempi e viabilità". torino.diariodelweb.it. Diario di Torino. November 2, 2017. Retrieved January 4, 2018.
  3. ^ Diego Longhin (December 14, 2017). "Corso Grosseto, cantiere bloccato: nel cavalcavia da abbattere c'è l'amianto". torino.repubblica.it. La Repubblica. Retrieved January 4, 2018.