Jump to content

Line 9 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
(Redirected from Line 9, Hangzhou Metro)
Line 9
 9 
Line 9 train
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations21
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Changda Road Depot
Sibao Stabling Yard
Rolling stockPM145
History
Opened10 July 2021; 3 years ago (2021-07-10)
Technical
Line length29.45 km (18.30 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

North extension to Tangqi
Changda Road Depot
1
Long'an
2
Wuzhou Road
3
Heyu Road
4
Qiushan Avenue
5
Linping
6
Nanyuan
7
Linpingnan Railway Station
8
Wengmei
9
Qiaosi
10
South Qiaosi
11
Coach Center
 1 
Line 1 interconnection
12
Jiumu Road
13
South Hongpu Road
14
Liubao
15
Wubao
Sibao Stabling Yard
16
Yudao
 19 
17
Sanbao
 6 
18
Jianghehui
19
Qianjiang Road
 2   4 
20
Xinye Road
21
Guanyintang
 7 
Line 9 drawn to scale.

Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a metro line in Hangzhou. The line is 29.45 km (18.30 mi) long and runs in a north–south direction between Guanyintang and Long'an.[1] The line is colored brown on system maps.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Coach Center — Linping 24 November 2012; 11 years ago (2012-11-24)[a]
10 July 2021; 3 years ago (2021-07-10)[b]
12.5 km (7.8 mi)[3] 7 Central section of Phase 1
Linping — Long'an 17 September 2021; 3 years ago (2021-09-17)[4] 6.2 km (3.9 mi)[5] 4 North section of Phase 1
Guanyintang — Coach Center
(except Liubao and Wubao)
1 April 2022; 2 years ago (2022-04-01)[6][7] 12 km (7.5 mi)[6] 10 South section of Phase 1
Liubao and Wubao 14 December 2022; 23 months ago (2022-12-14)[8] 2 Infill stations
  1. ^ as part of Line 1
  2. ^ Line 9 commencement[2]

Stations

[edit]
Legend

  - Operational
  - Under construction

Section Station name[1] Connections Distance
km
Location
English Chinese
North Long'an 龙安 0 0 Linping
Wuzhou Road 五洲路
Heyu Road 荷禹路
Qiushan Avenue 邱山大街
Central Linping 临平
Nanyuan 南苑
Linpingnan Railway Station 临平南高铁站  Hanghai 
Linpingnan railway station EVH
Wengmei 翁梅
Qiaosi 乔司
South Qiaosi 乔司南
Coach Center 客运中心  1  Shangcheng
South Jiumu Road 九睦路
South Hongpu Road 红普南路
Liubao 六堡
Wubao 五堡
Yudao 御道  19 
Sanbao 三堡  6 
Jianghehui 江河汇
Qianjiang Road 钱江路  2   4 
Xinye Road 新业路
Guanyintang 观音塘  7 

Rolling stock

[edit]
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM145 B 2020-2022 CRRC Nanjing Puzhen 186 (31 sets) 09 001 - 09 031 (090011-090316) Tc+Mp+M+M+Mp+Tc Changda Road Depot
Sibao Yard
 9 

See also

[edit]

References

[edit]
  1. ^ a b "杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复" (in Simplified Chinese). 2021-03-11.
  2. ^ "7月10日起,杭州地铁9号线来了!". 2021-07-07.
  3. ^ "喜讯!众合科技助力杭州地铁9号线临平段改造工程圆满完成". 2021-07-15. 为9号线的中段,由既有1号线临平支线拆分独立运营构成,长约12.5公里
  4. ^ "明天下午3时 杭州地铁9号线北段和7号线市民中心站正式开通". 2021-09-16.
  5. ^ "杭州地铁9号线北段即将开通 带你提前探营". 2021-09-09. 线路全长约6.2km
  6. ^ a b "今天上午10点,杭州地铁7号线江北段、9号线南段开通". 2022-04-01.
  7. ^ "杭州地铁7号线江北段、9号线一期南段、5号线宝善桥站,今天全部开通了". Hangzhou.com.cn. 2022-04-01. Retrieved 2022-04-01.
  8. ^ "明起,杭州地铁试行延长末班车!9号线五堡站、六堡站同步开通-杭州新闻中心-杭州网". hznews.hangzhou.com.cn. Retrieved 2022-12-13.