Jump to content

Kathmandu–Terai Expressway

From Wikipedia, the free encyclopedia
(Redirected from Kathmandu-Terai Fast Track)

National Highway 33 shield}}
Kathmandu–Terai/ Madhesh Expressway
काठमाडौं तराई मधेश द्रुतमार्ग
राष्ट्रिय राजमार्ग ३३
National Highway 34
Map
Kathmandu–Terai / Madhesh Expressway in red
Route information
Maintained by MoPIT (Department of Roads)
Length71 km (44 mi)
Major junctions
FromKathmandu, Nepal
ToNijgadh, Nepal
Location
CountryNepal
Highway system
NH32 NH34

Kathmandu–Terai/Madhesh Expressway or NH33 (previously: H20) (Nepali: काठमाडौँ तराई द्रुतमार्ग), also known as Fast Track, is an under construction road connecting Kathmandu and Nijgadh in southern Terai region of Nepal.[1] The road is 70.977 kilometres (44.103 mi) long, of which, 48.037 kilometres (29.849 mi) is normal roads, 12.885 kilometres (8.006 mi) is bridges and 10.055 kilometres (6.248 mi) is tunnels. The expressway is being constructed by Nepal Army, originally scheduled to be completed by September 2021.[2] The new set target date for completion is 2026.[3] As of June 2024, around 30% of the work has been completed.

The consulting service for the construction is provided by Yooshin Engineering, a Korean firm.[4] The most complicated section, including the tunnels and several bridges will be constructed by Chinese companies China State Construction Engineering and Poly Changda Engineering.[5]

Controversies

[edit]

In 2020, the Nepal Army had selected six international firms to provide consultation service for the project, however the process was stopped after a probe found that the selection criteria were leaked.[6]

See also

[edit]

References

[edit]
  1. ^ Khatiwada, Sachet; Aryal, Rajan. "Effective Implementation of the 'Kathmandu–Terai/Madhesh Fast Track' Road Project": 8. {{cite journal}}: Cite journal requires |journal= (help)
  2. ^ Lamsal, Himal. "Kathmandu-Tarai/Madhesh fast track achieves 11 pc physical progress in three years". My Republica. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  3. ^ Magazine, New Spolight. "Kathmandu–Terai/Madehsh Expressway Fast Progress". SpotlightNepal. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  4. ^ "Public Procurement Review Committee to look into alleged irregularity in selection of consultant for Nijgadh expressway". Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  5. ^ "Chinese companies to construct "most complicated" section of Nepal's road project". Macau Business. 15 May 2021. Archived from the original on 16 May 2021. Retrieved 1 June 2021.
  6. ^ "Government halves budget for Kathmandu-Tarai expressway". Archived from the original on 13 April 2021. Retrieved 13 April 2021.
[edit]