Fives–Hirson railway
Appearance
(Redirected from Fives-Hirson Railway)
This article relies largely or entirely on a single source. (September 2017) |
Fives–Hirson Railway | |
---|---|
Overview | |
Status | Open |
Owner | SNCF (1938–present) |
Locale | France (Hauts-de-France) |
Termini | |
History | |
Opened | 1869 - 1872 |
Technical | |
Line length | 123 km (76 mi) |
Number of tracks | Double track |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Fives–Hirson railway is a double tracked electrified railway line linking Lille-Flandres with Hirson.
History
[edit]The line opened in stages:[1]
- Aulnoye to Hirson, 30 October 1869
- Lille to Gare de Valenciennes, 22 June 1870
- Valenciennes to Aulnoye, 1 September 1872
Infrastructure
[edit]Electrification was complete by 1958. The line uses automatic block signalling (BAL, Bloc Automatique Lumineux).
References
[edit]- ^ "Rapports et délibérations - Nord, Conseil général". Gallica. Retrieved 22 March 2014.