File:TVD1-Brochure elements 22.png
Original file (273 × 913 pixels, file size: 211 KB, MIME type: image/png)
This is a file from the Wikimedia Commons. Information from its description page there is shown below. Commons is a freely licensed media file repository. You can help. |
Summary
DescriptionTVD1-Brochure elements 22.png |
English: First Crew Module for Gaganyaan test flight takes shapeHome /Gaganyaan TV-D1
October 06, 2023 Crew Module (CM) is where the astronauts are containedin a pressurized earthlike atmospheric condition during the Gaganyaan mission. The CM for the Gaganyaan mission is in different stages of development. For the Test Vehicle Abort mission-1 (TV-D1), the CM is an unpressurised version that has completed its integration and testing and is ready to be shipped to the launch complex. This unpressurised CM version has to have an overall size and mass of actual Gaganyaan CM. It houses all the systems for the deceleration and recovery. With its complete set of parachutes, recovery aids actuation systems and pyros. The avionics systems in CM are in a dual redundant mode configuration for navigation, sequencing, telemetry, instrumentation and power. The CM in this mission is extensively instrumented to capture the flight data for evaluation of the performance of various systems. The Crew Module will be recovered after touchdown in the Bay of Bengal, using a dedicated vessel and diving team from the Indian Navy. The first development flight Test Vehicle (TV-D1) is in the final stages of preparation. The Test Vehicle is a single-stage liquid rocket developed for this abort mission. The payloads consist of the Crew Module (CM) and Crew Escape Systems (CES) with their fast-acting solid motors, along with CM fairing (CMF) and Interface Adapters. This flight will simulate the abort condition during the ascent trajectory corresponding to a Mach number of 1.2 encountered in the Gaganyaan mission. CES with CMwill be separated from the Test Vehicle at an altitude of about 17 km. Subsequently, the abort sequence will be executed autonomously commencing with the separation of CES and deployment of the series of parachutes, finally culminating in the safe touchdown of CM in the sea, about 10 km from the coast of Sriharikota. The Crew Module after integration underwent various electrical testing, at ISRO’s facility in Bengaluru, including an acoustic test and was dispatched to SDSC-SHAR on 13th August. At SDSC, it will undergo vibration tests and pre-integration with the Crew Escape System, before final integration to the Test Vehicle at the Launch Pad. This Test Vehicle mission with this CM is a significant milestone for the overall Gaganyaan programme as a near-complete system is integrated for a flight test. The success of this test flight will set the stage for the remaining qualification tests and unmanned missions, leading to the first Gaganyaan mission with Indian Astronauts. |
Date | |
Source | https://www.isro.gov.in/media_isro/pdf/TVD1/TVD1-Brochure.pdf |
Author | Indian space research organization |
Licensing
This file is a copyrighted work of the Government of India, licensed under the Government Open Data License - India (GODL).
Information on Related Items:
https://data.gov.in/sites/default/files/Gazette_Notification_OGDL.pdf GODL-India Government Open Data License – India true true |
||
Attribution: Indian Space Research Organisation (GODL-India) | ||
বাংলা ∙ Deutsch ∙ English ∙ español ∙ français ∙ हिन्दी ∙ 日本語 ∙ മലയാളം ∙ मराठी ∙ русский ∙ 中文 ∙ 中文(简体) ∙ 中文(繁體) ∙ 中文(臺灣) ∙ +/− |
This image, which was originally posted in the source indicated above, has not yet been reviewed by an administrator or reviewer to confirm that the above license is valid. See Category:Unreviewed photos of GODL-India for further instructions.
|
Items portrayed in this file
depicts
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:04, 17 October 2023 | 273 × 913 (211 KB) | Chinakpradhan | Uploaded a work by Indian space research organization from https://www.isro.gov.in/media_isro/pdf/TVD1/TVD1-Brochure.pdf with UploadWizard |
File usage
The following 2 pages use this file:
Metadata
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Horizontal resolution | 28.35 dpc |
---|---|
Vertical resolution | 28.35 dpc |