File:San Agustine Bridge Malisik River Views3.jpg
Appearance
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 4,096 × 3,072 pixels.
Original file (4,096 × 3,072 pixels, file size: 1.7 MB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 08:17, 15 February 2024 | 4,096 × 3,072 (1.7 MB) | Valenzuela400 | San Agustine Bridge, Candaba in February, 2024 with P 91 million slope protection works at Malisik River Dike or channel of the Pampanga River Rio Grande in San Agustin, Candaba at the foot of majestic Mount Arayat (On May 21, 2016 Candaba’s P30 million San Agustin (Bomba) Bridge approach collapsed due to alleged poor engineering design. It was retrofitted and rehabili... |
File usage
The following page uses this file: