Jump to content

File:Reading Hydro (geograph 7093125).jpg

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

Original file (4,032 × 3,024 pixels, file size: 5.21 MB, MIME type: image/jpeg)

Summary

Description
English: Reading Hydro. The recently opened Reading Hydro, a Community Benefit Society run hydropower scheme that generates renewable, low-carbon electricity from the power of the River Thames. It uses the head of water provided by the weir at Caversham Lock. Here the twin Archimedes screws are seen in operation.
Date Taken on 14 November 2021
Source Own work
Author Chris Wood
Other versions
Attribution
(required by the license)
InfoField
Chris Wood / Reading Hydro / 
Chris Wood / Reading Hydro
Camera location51° 27′ 41.29″ N, 0° 57′ 51.7″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location51° 27′ 41.3″ N, 0° 57′ 53″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
You may select the license of your choice.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

14 November 2021

51°27'41.292"N, 0°57'51.750"W

heading: 292 degree

51°27'41.33"N, 0°57'53.50"W

heading: 292 degree

0.00595238095238095238 second

4.3 millimetre

image/jpeg

4cb57910fe9f4c997d3508c5d1a828e3990d2d49

5,462,604 byte

3,024 pixel

4,032 pixel

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current12:40, 14 February 2022Thumbnail for version as of 12:40, 14 February 20224,032 × 3,024 (5.21 MB)Chris j wood== {{int:filedesc}} == {{Information |Description={{en|1=Reading Hydro. The recently opened Reading Hydro, a Community Benefit Society run hydropower scheme that generates renewable, low-carbon electricity from the power of the River Thames. It uses the head of water provided by the weir at Caversham Lock. Here the twin Archimedes screws are seen in operation.}} |Source=From [https://www.geograph.org.uk/photo/7093125 geograph.org.uk] |Date={{Taken on|2021-11-14|location=United Kingdom}} |Auth...

The following page uses this file:

Global file usage

The following other wikis use this file:

Metadata