DescriptionNiger, Dosso (73), railway to Niamey.jpg
English: The end of the Niamey-Dosso railway line, 6 km south of Dosso, in Niger. This line ("Blueline Niger", 135 km) was built from 2014 and inaugurated in 2016 but has never been used. It should have been continuing to Parakou in Benin, but the track from Dosso to Parakou was never built.
Français : La fin de la ligne ferroviaire Niamey-Dosso, à 6 km au sud de Dosso, au Niger. Cette ligne («Blueline Niger», 135 km) a été construite à partir de 2014 et inaugurée en 2016 mais n'a jamais été utilisée. Il aurait dû continuer jusqu'à Parakou au Bénin, mais la piste de Dosso à Parakou n'a jamais été construite.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.http://www.gnu.org/copyleft/fdl.htmlGFDLGNU Free Documentation Licensetruetrue
You may select the license of your choice.
Captions
Add a one-line explanation of what this file represents
{{Information |Description={{en|1=The end of the Niamey-Dosso railway line, 6 km south of Dosso, in Niger. This line ("Blueline Niger", 135 km) was built from 2014 and inaugurated in 2016 but has never been used. It should have been continuing to Parakou in Benin, but the track from Dosso to Parakou was never built.}} {{fr|1=La fin de la ligne ferroviaire Niamey-Dosso, à 6 km au sud de Dosso, au Niger. Cette ligne («Blueline Niger», 135 km) a été construite à partir de 2014 et inaugurée en 20...