Jump to content

File:Gotthard Railway - Goeschenen signalbox.jpg

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

Original file (5,396 × 3,597 pixels, file size: 6.43 MB, MIME type: image/jpeg)

Summary

Description The signalbox at the north portal of the Gotthard rail tunnel from 1882 remains in operation until 2021. Afterwards the new operations center south in Pollegio undertakes the control. The lighting in the tunnel is controlled in Pollegio already today. Switzerland, Nov 18, 2015.
Date
Source Gotthard Railway - Göschenen
Author Kecko from Rural area, Eastern Switzerland
Camera location46° 39′ 56.1″ N, 8° 35′ 19.29″ E Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Kecko at https://flickr.com/photos/70981241@N00/22720400768. It was reviewed on 10 January 2016 by FlickreviewR and was confirmed to be licensed under the terms of the cc-by-2.0.

10 January 2016

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

46°39'56.099"N, 8°35'19.295"E

18 November 2015

image/jpeg

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:46, 10 January 2016Thumbnail for version as of 14:46, 10 January 20165,396 × 3,597 (6.43 MB)NAC{{Information |Description=The signalbox at the north portal of the Gotthard rail tunnel from 1882 remains in operation until 2021. Afterwards the new operations center south in Pollegio undertakes the control. The lighting in the tunnel is controlled...

The following page uses this file: