Jump to content

File:Fullneed.jpg

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

Original file (948 × 592 pixels, file size: 263 KB, MIME type: image/jpeg)

Summary

Description
English: Theoretical space needed for solar power plants to generate sufficient electric power in order to meet the electricity demand of the world, Europe (EU-25) and Germany (de) respectively. Electrical energy being globally around 17% of energy demand (Germany 22%), the areas would have to be roughly five times the size for total energy demand. (Data by the German Center of Aerospace (DLR), 2005).
Deutsch: Theoretischer Platzbedarf für Solarkraftwerke, welche in der Lage wären ausreichend elektrische Energie zu erzeugen um den Strombedarf der Welt, der EU-25, sowie Deutschlands (de) zu decken. Da elektrische Energie global bei ca. 17% (Deutschland 22%) des Gesamtenergiebedarfs liegt, müssten die Flächen ungefähr fünf mal größer sein, um den Gesamtenergiebedarf zu decken. (Basierend auf Daten des Deutschen Zentrums für Luft- und Raumfahrt).
Español: Espacio teórico necesario para que las plantas de energía solar generen energía eléctrica suficiente para satisfacer la demanda de electricidad del mundo, de Europa (UE-25), y de Alemania (de), respectivamente. Dado que la energía eléctrica es globalmente alrededor del 17% de la demanda de energía (Alemania, 22%), las áreas tendrían que ser aproximadamente cinco veces mayores que la demanda total de energía. // Datos del Centro Alemán de Aeroespacio (DLR), 2005.
日本語: 右からドイツ、EU25カ国および全世界の需要と等しい電力を太陽エネルギーで発電するのに必要な面積
Date
Source

Diploma Thesis of Nadine May: www.dlr.de/.../Ecobalance_of_a_Solar_Electricity_Transmission.pdf, page 26 (figure 12, page 12)

Technical University of Braunschweig, Faculty for Physics and Geological Sciences, in collaboration with the Institute of Technical Thermodynamics at the DLR, Stuttgart, Germany
Author Nadine May
Permission
(Reusing this file)

Source: www.TRECers.net

cc-by-sa-25 license at source: http://www.trecers.net/press.html

Licensing

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.5 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

17 August 2005

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:04, 12 December 2012Thumbnail for version as of 14:04, 12 December 2012948 × 592 (263 KB)JaybearGreater (200%) image extracted from pdf-source; image-text changed: Welt > World, D > De;
09:25, 3 March 2006Thumbnail for version as of 09:25, 3 March 2006795 × 496 (106 KB)Benderson2~commonswikiTheoretical Space needed for solar power plants to generate sufficient electric power in order to meet the energy demand of the World, Europe (EU-25) and Germany respectively. (Data by the German Center of Aerospace (DLR), 2005) Out of a study from the D

The following 2 pages use this file:

Global file usage

The following other wikis use this file: