English: A day before the scheduled Inauguration 13.10.13 6.30pm.
Foundation stone laid 27.10.2012. The total length of the bridge is 494 m and width is 13 m with a carriageway width of 7.5 m. the navigation span is 120 m. The approach road at Aldona is approx. 320 m and at Calvim is 100m. The awarded cost of the project is rs. 54.84 crore