Erin Mills station
Appearance
(Redirected from Erin Mills GO Station)
Erin Mills | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 4430 Erin Mills Parkway Mississauga, Ontario Canada | ||||||||||
Coordinates | 43°33′13″N 79°41′57″W / 43.55361°N 79.69917°W | ||||||||||
Owned by | Metrolinx | ||||||||||
Platforms | side platform | ||||||||||
Bus routes | |||||||||||
Bus operators | GO Bus MiWay | ||||||||||
Construction | |||||||||||
Parking | 300 park and ride spaces | ||||||||||
Bicycle facilities | Shelters | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | GO Transit: EMTW | ||||||||||
Fare zone | 21 | ||||||||||
History | |||||||||||
Opened | September 7, 2015[1] | ||||||||||
Services | |||||||||||
|
Erin Mills is a bus station in the community of Erin Mills in western Mississauga, Ontario, Canada. It is located northwest of the Erin Mills Parkway/Highway 403 interchange and is a stop on the Mississauga Transitway.[2]
Metrolinx began construction of the Mississauga Transitway West between Winston Churchill Boulevard and Erin Mills Parkway[3] in October 2013 and the entire project was expected to be complete in 2016.[4] The station opened earlier than expected in September 2015 for GO Transit buses but MiWay did not begin serving the station until September 2016.[1]
Bus service
[edit]GO Transit
[edit]- 25, 25L Waterloo/Mississauga[5]
- 29 Guelph/Mississauga[6]
- 41, 47G, 47W Hwy 407 West Corridor[7]
- 56 Highway 407 East Corridor [8]
MiWay
[edit]- 46 Tenth Line
- 48 Erin Mills
- 109 Meadowvale Express
- 110 University Express
References
[edit]- ^ a b "Mississauga Transitway: Erin Mills Station – Now Operational". MiWayBlog. City of Mississauga. September 7, 2015. Retrieved September 1, 2015.
- ^ "Mississauga Transitway Project". GO Transit. Archived from the original on August 21, 2014. Retrieved November 1, 2014.
To accommodate increased demand, improve your experience and our operations, GO Transit will be constructing a new GO Bus Station at Erin Mills Parkway. Construction of the new station started in 2013. The station is expected to be operational in 2016.
- ^ Robert Mackenzie (December 12, 2013). "Construction starts on west section of Mississauga Transitway". Transit Toronto. Retrieved November 1, 2014.
Metrolinx is building the west segment between Winston Churchill and Erin Mills.
- ^ "Mississauga Transitway West" (PDF). Mississauga Transitway Project: Project Status. Metrolinx. Retrieved November 1, 2014.
In October 2013, Metrolinx started construction on the Mississauga Transitway West (Winston Churchill Boulevard to Erin Mills Parkway).
- ^ "25 Waterloo/Mississauga GO Bus Schedule" (PDF). Retrieved November 15, 2023.
- ^ "29 Guelph/Mississauga GO Bus Schedule" (PDF). Archived from the original (PDF) on September 15, 2016. Retrieved August 29, 2016.
- ^ "407 West GO Bus Schedule" (PDF). Retrieved April 20, 2024.
- ^ "Oshawa/Oakville GO Bus Schedule" (PDF). Retrieved November 15, 2023.