Jump to content

New York State Canalway Trail

From Wikipedia, the free encyclopedia
(Redirected from Erie Canal Trail)
The Nine Mile Creek Aqueduct in the Camillus Erie Canal park. The arches now support a tow path trail.
A picnic area on the Mohawk Hudson Bike/Hike Trail, along the Hudson River

The New York State Canalway Trail is a network of multi-use trails that runs parallel to current or former sections of the Erie, Oswego, Cayuga-Seneca, and Champlain canals. When completed, the system will have 524 miles (843 km) of trails following current and former sections of the canals. The longest of these is the 365 miles (587 km) long Erie Canalway Trail.[1] The Erie and Champlain Canalway Trails are also part of the statewide Empire State Trail system.

A partnership of national, state, local and non-profit organizations is working to complete a continuous system of trails along these canals. Among the organizations involved are Parks & Trails New York, the New York State Canal Corporation and the Erie Canalway National Heritage Corridor.

Before the railroad era, New York had an extensive network of canals. As commercial freight shifted away from canals and towards rail and highways, communities along the canals needed new ways to generate commerce. In 1995, the Canal Corporation issued a recreation plan, which offered a view of the Canal as a linear park, including trails linking communities along the trail. Biking, hiking, snowmobiling, cross-country skiing, horseback riding, canoeing, and fishing are among activities promoted.

The original canals were flanked by towpaths, where mules walked while pulling barges through the canals. Many of the canalway trails follow former towpaths. Some trails follow canals that are still in use, serving mostly recreational boating. Other towpath trails pass by the ruins of abandoned locks and other structures. Many communities along the canal have made progress in establishing parks, improving towpaths and raising funds for restoration of old canal structures such as locks and aqueducts.

As of 2021, the Erie Canalway Trail is 100% complete. As part of the Empire State Trail project, the remaining gaps in the trail were filled and completed, both on-road and off-road, by the end of 2020.

Some of the individual sections are included below:

Erie Canalway trails

[edit]

Segments are listed from west to east.[2]

Section name Begin and end points Length Surface Comments
Erie Canal Heritage Trail Buffalo to Newark 114 miles Paved, stone dust
Old Erie Canal Port Byron to Camillus 28 miles Stone dust Includes Camillus Erie Canal Park and restored aqueduct at Nine Mile Creek
Old Erie Canal State Historic Park Dewitt to Rome 36 miles Paved, stone dust
Rome to Utica 30 miles Paved, stone dust
Mohawk Hudson Bike/Hike Trail Little Falls to Albany 86 miles Asphalt East end of Erie Canalway, connects to Hudson River Valley Greenway Trail

Other trails

[edit]
Section name Begin and end points Length Surface Comments
Old Champlain Canal Trail Waterford 3 miles Stone dust, soil Starts at the junction of the former Champlain Canal and the Erie Canal
Glens Falls Feeder Canal Trail Glens Falls 9 miles

References

[edit]
  1. ^ "Parks and Trails New York". Archived from the original (website) on 24 August 2007. Retrieved 17 June 2009.
  2. ^ "Erie Canalway Map & Guide" (PDF). Erie Canalway National Heritage Corridor, National Park Service. 2012. Archived from the original (PDF) on 2014-08-28.