Jump to content

Cross Eifel Railway

From Wikipedia, the free encyclopedia
(Redirected from Eifelquer Railway)
Cross Eifel Railway
Overview
Native nameEifelquerbahn
Line number
  • 478 (Andernach–Kaisersesch)
  • 12478 (Kaisersesch–Gerolstein)
LocaleRhineland-Palatinate, Germany
Termini
Service
Route number3005
Technical
Line length94.2 km (58.5 mi)
Number of tracks2: Andernach–Mendig
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed120 km/h (75 mph) (max)
Route map

94.2
Gerolstein
361 m
operations border: DB / VEB
92.1
Pelm
(halt, former Bf)
91.1
Kyll (Bridge blocked)
86.5
Hohenfels (Eifel)
81.0
Dockweiler-Dreis
(former Bf)
561 m
74.3
Rengen
former planned extension of
Ahr Valley Railway from Adenau
71.5
Daun
405 m
67.0
Darscheid
492 m
62.8
Utzerath
466 m
60.5
Berenbach
58.2
Ulmen
440 m
52.5
Höchstberg (Uersfeld)
520 m
48.2
Laubach-Müllenbach
551 m
operations border: VEB / DB
42.8
Kaisersesch
455 m
39.7
Urmersbach
387 m
33.7
Monreal
296 m
32.6
Monreal tunnel (185 m)
30.0
Geisbüsch tunnel (478 m)
26.2
Mayen West
Mayen-Brückentor
(planned)
23.6
Mayen Ost
271 m
20.2
Kottenheim
241 m
16.7
Thür
14.3
Mendig
191 m
10.1
Kruft
5.7
Plaidt
former branch line from Saffig
4.1
Miesenheim
Andernach Süd
(planned)
0.0
Andernach
Source: German railway atlas[1]
Steam train in Mayen Ost

The Cross Eifel Railway (German: Eifelquerbahn) is a non-electrified railway line between Andernach and Gerolstein in the Eifel in the German state of Rhineland-Palatinate. From Andernach to Mayen Ost (East), it is classified as main line and it has two tracks as far as Mendig.

Services on the Cross Eifel Railway currently[when?] operate about every 30 minutes between Andernach and Mayen Ost and continue to Kaisersesch hourly as part of the Lahn-Eifel-Bahn service.

The rail service between Andernach and Kaisersesch operated for a long time under the name of Pellenz-Eifel-Bahn (the Pellenz is a hilly area between Andernach and Mayen) and the section between Kaisersesch and Gerolstein was for a time operated as the Vulkan Eifel-Bahn. This service was discontinued in 2013.

History

[edit]
Kottenheim station (1892)
Cross Eifel Railway in Ulmen (2006)
On 10 September 2011, a railbus in Kaisersesch awaits the return trip to Gerolstein

The Cross Eifel Railway was opened in several stages, with the first section opening from Andernach to Niedermendig on 1 April 1878. The second section opened from Niedermendig to Mayen Ost on 29 May 1880 and the third section opened from Mayen Ost to Gerolstein on 15 May 1895. The building of a connection to Karden between Mayen West and Monreal was considered. From about 1880 the Cross Eifel Railway was administered by the Eisenbahndirektion (railway division of) Cologne of the Prussian state railways.

At the end of the Second World War, the line from Andernach to Mayen Ost was reopened by 8 April 1945. The part from Mayen Ost to Gerolstein did not follow until 29 August 1946.

On 13 January 1991, passenger traffic from Gerolstein to Mayen West was discontinued. Freight transport was initially continued between Ulmen und Kaisersesch; it was abandoned on 1 January 1998 between Gerolstein and Ulmen and on 28 May 2000 between Mayen and Kaisersesch.

On 6 August 2000, a few months after trans regio had taken over the operation between Andernach and Mayen, the line was reopened for passenger traffic from Mayen West to Kaisersesch.

The section from Gerolstein to Kaisersesch was used for tourist traffic in the season from May to October from 2 June 2001. Services ran at two-hour intervals on Sundays and holidays only; later the excursions also ran on Saturdays. Because of the poor state of the line, services were terminated in Ulmen. A daily tourist service ran in the summer from Gerolstein to Daun from 18 July 2005. After restoring and securing the section between Ulmen and Kaisersesch, the Cross Eifel Railway was once again open to traffic from 26 April 2008.

In an accident[2] on 6 June 2009 at an open level crossing near Hohenfels, a railbus collided with a truck-trailer combination. The crowded train derailed and fell down a slope. In all, there were 26 injured, five people were severely injured and the train driver and guard were seriously injured.

Reactivation plans and closure of the infrastructure

[edit]

In the course of the pre-planning for the Rhineland-Palatinate regular interval timetable to be introduced in 2015, several options were investigated to reactivate the Kaisersesch–Gerolstein section, which is not currently[when?] served by regular rail passenger transport. This study showed that the reactivation of part of the route would not to be useful in macroeconomic terms. Only the start-up of the entire route had a benefit-cost ratio above one and could thus be supported by the state. In this case, the journey time between Andernach and Gerolstein would be around two hours and patronage of up to 1900 passengers per day was estimated. The costs were then estimated to be about €20 million. On 9 June 2009, the SPNV Nord/Rheinland-Pfalz (north Rhineland-Palatinate municipal association for rail transport) approved the complete reactivation of the Cross Eifel Railway for local public transport by December 2014.[3] However, the cost estimate had to be corrected to €40 million in 2011 after a revision of the cost-benefit analysis, which meant that the reactivation of the overall route was no longer economically viable.

On the basis of the new figures, the municipality of Daun expressed its opposition to the reactivation of the Gerolstein–Daun–Kaisersesch section of the Cross Eifel Railway in December 2012. The previous operator announced shortly afterwards that it had not requested an extension of its operating license after 2013.

Since 1 January 2013, the infrastructure of the Cross Eifel Railway has been partly closed to traffic, because train operations are not possible without a new bridge at Pelm.[4] This also eliminates the steam trains operated by Lokschuppen Gerolstein; the associated Anheizparty ("heating party") was replaced by the Lokschuppen-Sommer ("locomotive shed summer").[5]

In the autumn of 2016, a separate cost-benefit analysis for the disused Kaisersesch–Gerolstein section was to be carried out on a basis that will allow local authorities and districts to decide on the future of the line. In this case, the estimated rehabilitation costs of €24 million (of which €6 million alone was for the necessary construction of the Pelm bridge) are likely to play a decisive role.[6]

Course of the line

[edit]

The Cross Eifel Railway follows the Eifel Railway from Gerolstein to Pelm closely, then branches off to the north-east and runs via Daun, Ulmen. Kaisersesch to Mayen. From there, it runs through several curves to Andernach, where it runs to the north to connect with the Left Rhine line.

The whole line is owned by DB Netz. The Ulmen–Kaisersesch section was finally returned to traffic after a comprehensive refurbishment in April 2008 for a railway station festival in Ulmen, but it is currently[when?] out of operation.

Former railways

[edit]

Operations

[edit]

Andernach – Mayen – Kaisersesch

[edit]

Trans regio operated passenger services on the line, including the reactivated section between Mayen and Kaisersesch, with Regio-Shuttles from 28 May 2000 to about 13 December 2008.

Since 14 December 2008, it has been operated by DB Regio with class 628.3 (double-deck) sets at hourly intervals. The trains cross in Mayen Ost, although the symmetry minute of the line is about four minutes earlier than usual.

Since the timetable change in December 2014, the service operated by DB Regio continues to operate as the Lahn-Eifel-Bahn hourly from Kaisersesch via Mayen to Andernach (RB 38) as well as from Mayen via Andernach to Koblenz and continues to Limburg an der Lahn (as RB 23). This gives an approximately 30-minute cycle in both directions on the section between Mayen and Andernach, as well as significantly improving the accessibility of the Koblenz inner city from the stations of the Cross Eifel Railway. At the same time the class 628 cars, which had been used since 2008, were replaced by class 643 (Bombardier Talent), class 648 (Alstom Coradia LINT 41) and class 640 (LINT 27) railcars.

Kaisersesch – Daun – Gerolstein

[edit]

The Vulkan-Eifel-Bahn (VEB) operated the section of line from Kaisersesch to Pelm from 2000 and operated a two-hour cycle on weekends and public holidays from May to October using railbuses. In the summer months services were also operated between Gerolstein and Ulmen during the week. In addition, during the summer holidays on Wednesdays, a steam train, consisting of a class 52 steam locomotive and historical passenger cars, ran between Gerolstein and Ulmen.

At the end of 2012, the political committees rejected the investment in the rail infrastructure, so the VEB announced that from 2013 no excursions would run on this section of the line.

At the end of March 2013, it became known that the state of Rhineland-Palatinate would provide €13 million for the repair of the infrastructure to enable the tourist excursions to run again.[8]

Planning

[edit]

Two further stations are to be built up to the middle of the 2020s: Andernach Süd[9] (in the Straße Leibnizhof area) and Mayen-Brückentor[10] (at the level crossing on Straße Auf der Eich). The SPNV Nord assumes daily patronage of 700 (Andernach Süd) and 500 (Mayen-Brückentor).

Notes

[edit]
  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. ^ "Schwerverletzte bei Zugunglück in der Eifel". Der Spiegel (in German). 6 June 2009. Retrieved 22 February 2009.
  3. ^ "Eifelquerbahn wird reaktiviert". Ad Hoc News (in German). 9 June 2009. Archived from the original on 14 December 2009. Retrieved 22 February 2017.
  4. ^ "Klare Ansage: Zugverkehr nur mit neuer Brücke" (in German). Volksfreund.de. 21 November 2014. Retrieved 22 February 2017.
  5. ^ "Lokschuppen Gerolstein" (in German). Retrieved 22 February 2017.
  6. ^ "Bahn-Report" (in German) (5). 2016: 54. {{cite journal}}: Cite journal requires |journal= (help)
  7. ^ "Maifeld-Radweg" (in German). Bahntrassenradwege. Retrieved 22 February 2017.
  8. ^ "Mehr Schotter für die Eifelquerbahn" (in German). Volksfreund. 21 March 2013. Retrieved 22 February 2017.
  9. ^ Yvonne Stock (14 July 2016). "Millionenprojekt geplant: Bahnhof in Andernach-Süd". Rhein-Zeitung (in German). Retrieved 22 February 2017.
  10. ^ Hilko Röttgers (17 August 2016). "Bahnhofs-Idee für Mayen: Züge sollen auf der Eich halten". Rhein-Zeitung (in German). Retrieved 22 February 2017.

Sources

[edit]
  • Hans-Peter Kuhl (1996). Die Eifelquerbahn Mayen-Gerolstein (in German). Gülzow: Lok-Rundschau. ISBN 3-931647-02-1.
[edit]