Jump to content

Kinshasa Arena

From Wikipedia, the free encyclopedia
(Redirected from Draft:Kinshasa Arena)

Kinshasa Arena
AddressKinshasa
Democratic Republic of the Congo
TypeIndoor arena
Capacity20,000
Construction
Broke ground13 October 2023
BuilderSUMMA

Kinshasa Arena is an indoor arena under construction located in Kinshasa, the Democratic Republic of the Congo. Located next to the Stade des Martyrs and capable of hosting 20,000 people, it will be the largest indoor hall in the country. Ground broke in October 2023 and construction is expected to finish in 2026.

History

[edit]

The new arena was first announced in 2022 when President Félix Tshisekedi promised the building of a new 20,000-seater arena following the DR Congo men's national team gold medal win in the FIBA AfroCan 2019. The DR Congo signed a memorandum of understanding with Turkish contractor SUMMA, who had earlier built the BK Arena and Dakar Arena in Africa.[1][2]

Construction officially began on 13 October 2023 and is expected to finish within 36 months.[3]

References

[edit]
  1. ^ Philémon (9 July 2022). "Basketball - DR Congo: The construction of Kinshasa Arena in sight - At a glance". Sport News Africa. Retrieved 21 March 2024.
  2. ^ "La RDC signe un contrat avec la société turque « SUMMA » pour la construction de « Kinshasa Arena »". www.aa.com.tr. Retrieved 21 March 2024.
  3. ^ "Kinshasa : lancement officiel des travaux de construction de l'Arena". nzadinews.net (in French). 31 October 2023. Retrieved 21 March 2024.