Jump to content

Ohio State Route 59

Route map:
From Wikipedia, the free encyclopedia
(Redirected from Cuyahoga Falls-Kent Road)
State Route 59 marker
State Route 59
Route information
Maintained by ODOT
Length22.99 mi[1] (37.00 km)
Existed1969–present
Major junctions
West end I-76 / I-77 in Akron
Major intersections SR 8 from Akron to Cuyahoga Falls
East end SR 5 near Ravenna
Location
CountryUnited States
StateOhio
CountiesSummit, Portage
Highway system
  • Ohio State Highway System
SR 58 SR 60

State Route 59 (SR 59) is an east–west state highway in the U.S. state of Ohio, serving the Akron metropolitan area. The western terminus of State Route 59 is in downtown Akron at a partial interchange with the Interstate 76/Interstate 77 concurrency, and the eastern terminus is at State Route 5, 0.5 miles (0.80 km) east of Ravenna. The route is approximately 23 miles (37 km) long and was certified in 1969 over what had previously been part of SR 5. It serves as a major or as the primary east–west roadway for the cities of Cuyahoga Falls, Kent, Ravenna, and Stow, the village of Silver Lake, and Franklin and Ravenna Townships.

Route description

[edit]

State Route 59 traverses parts of Summit and Portage Counties, with a western terminus at a partial interchange with Interstates 76 and 77 in Akron and an eastern terminus at State Route 5 in Ravenna Township. The entire length of the 22.99-mile (37.00 km) road is included within the National Highway System, a network of routes deemed most important for the economy, mobility and defense of the nation.[2]

The western terminus of SR 59 is the Akron Innerbelt, a limited access highway originally meant to bypass downtown. The interchange with Interstates 76 and 77 is only partial, with direct access to SR 59 from eastbound 76/southbound 77 and direct access to westbound 76/northbound 77 from SR 59. Traffic going the opposite directions must use surface streets to access the other highway. Westbound SR 59 traffic wishing to access east 76 and south 77 must exit the freeway and follow Rhodes Avenue, while west 76 and north 77 traffic wishing to access eastbound SR 59 must use the Dart Avenue exit, accessing SR 59 via Russell Avenue, Rhodes Avenue, and Dart Avenue.[3]

At Opportunity Parkway, SR 59 has its first of four junctions with State Route 261. After crossing Cedar Avenue and Exchange Street, SR 59 exits the freeway section and is known as Martin Luther King Boulevard. It passes under State Route 18 (Market Street) as it veers to the east and becomes a regular surface street with signalized intersections. The second of four junctions with SR 261 is at the All-America Bridge, which connects North High Street (261 West) and North Broadway Streets (261 East). After crossing Prospect Street, the roadway is known as Perkins Street. At State Route 8, eastbound SR 59 turns north and enters the freeway with SR 8 at Fountain Street, while westbound 59 exits the freeway at Goodkirk Street.[3]

Haymaker Parkway in Kent

State Routes 8 and 59 are cosigned for approximately 5 miles (8.0 km), running north–south between exit 1B (Perkins Street) and exit 6 (Front Street). The third junction with SR 261 is at exit 3A (Tallmadge Avenue) and SR 59 enters the city of Cuyahoga Falls at exit 3B (Cuyahoga Falls Avenue/Howe Avenue). After passing downtown Cuyahoga Falls, SR 59 exits the freeway onto Front Street in Cuyahoga Falls and veers again to the east as a four-lane road. After passing into the village of Silver Lake, the roadway is known as Kent Road. As Kent Road, SR 59 continues into Stow, where it has a junction with State Route 91 (Darrow Road).[3]

Entering Portage County and Kent, SR 59 is part of West Main Street. At the intersection with Longmere Drive, SR 59 continues east onto Haymaker Parkway, a five-lane roadway that carries it over all three railroad lines in Kent and Cuyahoga River and bypasses downtown Kent to the south and east. Just west of the bridge over Cuyahoga River, southbound State Route 43 joins from South Mantua Street, while northbound 43 leaves at River Street. State Routes 43 and 59 are cosigned for a short distance, crossing the Cuyahoga River and two railroad lines. Just east of the bridge, at South Water Street, southbound 43 exits the concurrency, while northbound 43 enters. At Willow Street, SR 59 joins East Main Street and passes the campus of Kent State University. After leaving the Kent city limits into Franklin Township, the roadway is known as Kent–Ravenna Road. In Franklin Township, SR 59 meets the eastern terminus of SR 261, the fourth junction with 261. The route continues east into Ravenna Township and becomes West Main Street as it enters Ravenna. Continuing east into downtown Ravenna, the roadway becomes East Main Street after crossing Chestnut Street. Just east of the downtown area Freedom Street, SR 59 meets the southern terminus of State Route 88 and passes through the East Main Street Historic District. Just past the eastern city limits, in an area known as Cotton Corners, the roadway becomes Ravenna–Warren Road and intersects with State Routes 44 and 14 (Cleveland–East Liverpool Road). Just under 1 mile (1.6 km) east is the eastern terminus of SR 59 at a junction with State Route 5. Ravenna–Warren Road continues east as SR 5.[3]

Outside of the freeway sections of the Martin Luther King Freeway and the portion cosigned with SR 8, the roadway is four or five lanes through Cuyahoga Falls, Silver Lake, Stow, and Kent. The road narrows to two or three lanes in between a railroad underpass just east of SR 261 in Franklin Township and Menough Road in Ravenna Township. It widens back to four lanes at Menough Road just west of the Ravenna city limits, and is four and five lanes as it enters Ravenna up to Sycamore Street, where it narrows to three lanes as it passes through downtown Ravenna. After passing through downtown Ravenna, the road widens back to five lanes at Linden Street east through the junction with State Routes 14 and 44. East of the 14/44 junction, it narrows back to two or three lanes for remaining portion to the eastern terminus at SR 5, which continues east as a two-lane road.[4]

History

[edit]

At the 1923 Ohio state highway renumbering, State Route 59 was assigned to the roadway between Norwalk and Elyria.[5] By 1929, the western terminus was moved to Milan before being extended further west to Bellvue by 1930.[6][7] The entire roadway was made part of State Route 113 by 1939.[8]

The current State Route 59 was certified in 1969 with the eastern terminus at its current location and the western terminus at the intersection of North Main Street and Cuyahoga Falls Avenue in Akron, where it met SR 8. The general route was originally designated as part of State Route 36 from 1923 to 1932 and as State Route 5 from 1932 to 1969. The creation of SR 59 was part of a reroute of State Route 5 to a new southeastern bypass of Ravenna to end at Interstate 76 in Rootstown. State Route 585 was certified the same year for the portion of SR 5 between State Route 21 and Wooster. In its 1969 route, the western terminus of SR 59 was the intersection of East Cuyahoga Falls Avenue and North Main Street in the North Hill neighborhood of Akron, following the previous alignment of SR 5. SR 59 followed Cuyahoga Falls Avenue east, intersecting with the original end of the SR 8 expressway, then known as the SR 8 Bypass or 8-B. Just after the intersection with the expressway, SR 59 turned northward onto Front Street and followed Front Street and Second Avenue through Cuyahoga Falls.[9]

During the 1970s, multiple changes were made to the alignment of SR 59 as various projects were completed. The western end of SR 59 was rerouted onto the SR 8 Expressway and Akron Innerbelt as the Innerbelt, later named the Martin Luther King Freeway, was completed in phases between 1972 and 1986.[10] The portion of SR 59 on Perkins Avenue was originally intended to be temporary until the northern leg of the Innerbelt was completed, and was officially designated at State Route 59T until August 2007.[11] The section through Kent was rerouted onto the new Haymaker Parkway in 1975 after previously following West and East Main Streets through the city.

The Innerbelt

[edit]
The Innerbelt looking northeast

Designed after almost all other highway projects in Akron were completed, the Innerbelt, later named the Martin Luther King Freeway, was envisioned as a 21.5-mile (34.6 km) stretch; however the only portion that was ever built was a 2.24-mile (3.60 km) stretch near downtown Akron. The freeway is designed with six lanes and right-of-way for eight. It includes two collector streets along the entire corridor which, combined, are at some points as wide as the freeway itself. Planning and property acquisition began as early as 1968 and displaced thousands of residents, many of them minority and low-income residents, and over 100 businesses. The first portion of the freeway, between Exchange Street and Market Street, opened in 1972, while the next section, between Exchange Street and Howard Street, opened in 1978, and the interchange with I-76/I-77 in 1986.[12][13]

In 1999 Akron mayor Don Plusquellic suggested ripping up the northern end of the freeway, making it a city street, and developing the surrounding land. The idea was fostered by a trip to Milwaukee, in which Plusquellic saw the much-maligned Park East Freeway spur in that city's downtown removed in order to reuse the land.[14] A similar plan presented in late 2014 proposed removal of the freeway north of the West Exchange Street overpass with an upgrade of the adjacent frontage roads to compensate.[14] Construction relating to this plan started in early 2017.[15] The city of Akron acquired the land with the abandoned roadways in 2021.[16]

In July 2001, the city announced that the Innerbelt would be closed for several days while a commercial was being shot.[17] The highway was also surveyed by the producers of the movie The Matrix Reloaded as a possible shooting spot of the highway scene.[18] The idea was eventually scrapped, because in the event that the scene would have to be reshot, the time to reset all the cars in their start position would take too long.[19]

A 2022 article in the Akron Beacon Journal stated that the construction of the Innerbelt displaced a large number of black residents within the city of Akron while devaluing the homes of those who stayed. The same article cited this, combined with the highway never being completed to its original destination in Kent, Ohio, as reasons for its gradual decommissioning through the late 2010s and early 2020s.[16]

Major intersections

[edit]

Note that the Akron Innerbelt does not have exit numbers on destination signage.

CountyLocationmi[1]kmExitDestinationsNotes
SummitAkron0.000.00

I-76 west / I-77 north – Barberton, Cleveland
Exit 21C (I-76/I-77); access to I-76 west/I-77 north and from I-76 east/I-77 south only
1.071.72



SR 261 (Vernon Odom Boulevard / Opportunity Parkway) to I-76 east / I-77 south
Westbound exit and eastbound entrance
1.68–
1.78
2.70–
2.86
Cedar Street / Exchange Street
Northern end of freeway
SR 18 / SR 162
2.774.46
SR 261 west (North High Street)
2.834.55
SR 261 east (North Broadway Street)
3.535.68
SR 8 south
Western (southern) end of SR 8 concurrency; exit 1B on SR 8 southbound
Southern end of freeway
4.417.102Glenwood AvenueEastbound exit / westbound entrance only
4.737.613A SR 261 (Tallmadge Avenue)Exit 3 on SR 8 southbound
5.649.083BCuyahoga Falls AvenueEastbound exit / westbound entrance only
Cuyahoga Falls6.099.804Howe Avenue
7.1511.515ABroad Boulevard
7.3411.815BPortage TrailEastbound exit / westbound entrance only
8.1613.13
SR 8 north – Cleveland
Eastern end of SR 8 concurrency
Northern end of freeway
Stow10.4616.83 SR 91 (Darrow Road)
PortageKent14.1322.74 SR 43 (South Mantua Street)Western end of SR 43 (southbound) concurrency; no access to South Mantua Street
14.5023.34
SR 43 north (River Street)
Western end of SR 43 (northbound) concurrency
14.8123.83 SR 43 (South Water Street)Eastern end of SR 43 concurrency
Franklin Township16.7827.00
SR 261 west
Eastern terminus of SR 261
Ravenna21.4134.46
SR 88 north (Freedom Street)
Southern terminus of SR 88
Ravenna Township22.1735.68 SR 14 / SR 44
22.9937.00
SR 5 east
No access from SR 5 eastbound to SR 59
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams". Retrieved 2010-04-30.
  2. ^ National Highway System: Akron, Ohio (PDF) (Map). Federal Highway Administration. October 1, 2020. Retrieved January 27, 2021.
  3. ^ a b c d "Ohio State Route 59" (Map). Google Maps. Retrieved January 25, 2021.
  4. ^ "SPORSR00059**C" (PDF). Straight Line Diagrams. Ohio Department of Transportation. June 10, 2020. Retrieved January 28, 2021.
  5. ^ Ohio Department of Highways and Public Works (July 1923). Map of Ohio Showing State Routes (PDF) (Map). 1:760,320. Columbus: Ohio Department of Highways and Public Works. Retrieved January 25, 2021.
  6. ^ Ohio Department of Highways (August 15, 1929). Map of Ohio Showing State Highway System (PDF) (Map). 1:760,320. Columbus: Ohio Department of Highways. OCLC 5673562, 7438560. Retrieved January 25, 2021.
  7. ^ Ohio Department of Highways (1930). Map of Ohio Showing State Highway System (PDF) (Map). 1:760,320. Columbus: Ohio Department of Highways. OCLC 5673562, 7237073. Retrieved January 25, 2021.
  8. ^ Ohio Department of Highways (1939). Ohio Highway Map (PDF) (Map). 1:633,600. Columbus: Ohio Department of Highways. OCLC 5673562, 7408341. Retrieved January 25, 2021.
  9. ^ Ohio Department of Highways (1969). Official Highway Map (PDF) (Map). c. 1:563,200. Columbus: Ohio Department of Highways. OCLC 5673562, 7448779. Retrieved January 26, 2021.
  10. ^ "Only One More Innerbelt Link to Go". Akron Beacon Journal. October 9, 1986.
  11. ^ Straight-Line Diagrams County Update Table (Summit, 2008) at the Wayback Machine (archived July 27, 2011)
  12. ^ Hindi, Noor (November 29, 2018). "A Road to Nowhere: How the Construction of Akron's Innerbelt Displaced Thousands". The Devil Strip. Retrieved January 28, 2021.
  13. ^ SR-59, Akron Innerbelt Construction, Akron: Environmental Impact Statement. Federal Highway Administration. January 1977. Retrieved January 28, 2021.
  14. ^ a b Powell, Cheryl; Stephanie Warsmith (December 30, 2014). "Akron residents wonder: What will happen to Innerbelt property? City's plan unclear". Akron Beacon Journal. Archived from the original on February 2, 2017. Retrieved December 31, 2014.
  15. ^ Schleis, Paula (January 26, 2017). "Downtown Akron intersection to close for six months; part of Innerbelt will not reopen". Akron Beacon Journal. Archived from the original on February 2, 2017. Retrieved January 27, 2017. The beginning of construction will also mark the end of a large part of the Innerbelt, which will be permanently closed north of the Dart Avenue exit ramp.
  16. ^ a b Bayram, Seyma (February 3, 2022). "The failed Akron Innerbelt drove decades of racial inequity. Can the damage be repaired?". Akron Beacon Journal. Retrieved February 10, 2022.
  17. ^ Commercial Shoot to Close Innerbelt This Week at the Wayback Machine (archived December 18, 2004)
  18. ^ Key Location Manager, USA, Peter Novak 2001 (retrieved November 19, 2005).
  19. ^ Chasing the Stars: Carmakers in Movies Archived 2005-03-06 at the Wayback Machine, Ann Job (retrieved January 30, 2005)
[edit]
KML is from Wikidata