Jump to content

Brickland MRT station

Coordinates: 1°22′07″N 103°44′58″E / 1.3685°N 103.7494°E / 1.3685; 103.7494
From Wikipedia, the free encyclopedia
(Redirected from Brickland (MRT))

 NS3A 
Brickland
红砖
பிரிக்லேன்ட்
Future Mass Rapid Transit (MRT) station
Future site of Brickland station, located at where the train is
General information
Coordinates1°22′07″N 103°44′58″E / 1.3685°N 103.7494°E / 1.3685; 103.7494
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
Platforms2 (2 side platforms)
Construction
Structure typeElevated
AccessibleYes
History
Opening2034; 10 years' time (2034)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Bukit Gombak
towards Jurong East
North–South Line
Future service
Choa Chu Kang
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Brickland
Brickland station in Singapore

Brickland MRT station is a future Mass Rapid Transit (MRT) station on the North–South line located in Singapore. It will serve the Choa Chu Kang Neighbourhood 8 as well as Pavilion Park and Tengah Brickland District.[1]

History

[edit]
Artist impression of Brickland station

Brickland station was first announced on 25 May 2019 as part of the Land Transport Authority's (LTA) Land Transport Master Plan 2040.[2] The station was planned to serve approximately 13,000 existing households from Keat Hong, Bukit Batok West, Pavilion Park, Tengah town’s Brickland district, and future residential developments.[3] Officially confirmed on 28 July 2023, the station is targeted to begin construction in 2024 with a completion date of 2034. Construction works for the station will include a new viaduct and crossover tracks.[4][5] The longer construction duration for the infill is due to extensive modification works needed since the section of the line was not designated for an infill station. Construction can only take place during maintenance hours at night.[6]


Details

[edit]
Road level of the future Brickland MRT station

Serving the North South line (NSL), Brickland station will be between the Bukit Gombak and Choa Chu Kang stations. The official station code will be NS3A.[7] The station will be constructed along Bukit Batok West Avenue 5 near the junction with Bukit Batok Road.[8]

References

[edit]
  1. ^ Toh, Ting Wei (25 May 2019). "Two new MRT stations for North-South Line by mid-2030s; potential new rail line being studied as part of Land Transport Master Plan". The Straits Times.
  2. ^ "Land Transport Master Plan 2040: Bringing Singapore Together". LTA. 2 May 2019. Retrieved 26 May 2019.
  3. ^ "Written Reply to Parliamentary Question on Considerations in Siting Proposed Brickland MRT Station at Current Planned Location". Ministry of Transport (MOT). 4 October 2023. Retrieved 5 October 2023.
  4. ^ "Construction on new Brickland MRT station along North-South Line to start in 2024". CNA. 28 July 2023. Retrieved 28 July 2023.
  5. ^ "New Brickland Station to Enhance Rail Connectivity in Western Singapore". LTA. 28 July 2023. Retrieved 28 July 2023.
  6. ^ Kok, Yufeng (28 July 2023). "New Brickland MRT stop between Choa Chu Kang and Bukit Gombak set to open in 2034". The Straits Times. Retrieved 28 July 2023.
  7. ^ "Annex C: System Map including Brickland Station" (PDF). Land Transport Authority. Retrieved 28 July 2023.
  8. ^ "Annex A: Location Map of Brickland Station" (PDF). Land Transport Authority. Retrieved 28 July 2023.