Jump to content

Blue Line (Calgary)

Route map:
From Wikipedia, the free encyclopedia
(Redirected from Blue Line (CTrain))
Blue Line
A Blue Line train at Saddletowne station
Overview
StatusOperational
OwnerCalgary Transit
LocaleCalgary, Alberta, Canada
Termini
Stations25
WebsiteCalgary Transit
Service
TypeLight rail
SystemCTrain
Route number202
Operator(s)Calgary Transit
History
OpenedApril 29, 1985 (1985-04-29)
Technical
Line length23 km (14 mi)
Number of tracks2
CharacterAt-grade, elevated, underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line600 V DC[1]
Route map
Map Blue Line highlighted in blue
69 Street
Sirocco
45 Street
Westbrook
Shaganappi Point
Sunalta
Downtown West–Kerby
8 Street SW
7 Street SW
6 Street SW
4 Street SW
3 Street SW
1 Street SW
Centre Street
City Hall/Bow Valley College
Bridgeland/Memorial
Zoo
Barlow/Max Bell
Franklin
Marlborough
Rundle
Whitehorn
Oliver Bowen Yard
McKnight–Westwinds
Martindale
Saddletowne

7th Avenue free fare zone
Westbound only stop
Eastbound only stop

Handicapped/disabled access All stations are accessible

The Blue Line, also known as Route 202, is a light rail transit (LRT) line in Calgary, Alberta, Canada. Partnered with the Red Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, with the first trains running on what is now the Blue Line in 1985.

History

[edit]

Origin

[edit]

The concept of a light rail transit system (LRT) was approved in 1976 by the City of Calgary, with the first 12.9-kilometre (8.0 mi) section running from Anderson Road in the southwest, northbound, and into downtown, opening in 1981. Originally planned for 40,000 passengers per day, this initial section quickly achieved its designed ridership and is now part of the Red Line. Based on the success of the Anderson-downtown section, the city approved a second route which would head northwest towards the University of Calgary and the Southern Alberta Institute of Technology. Opposition to the routing through the neighborhood of Sunnyside resulted in a switch of priority to the northeast, in what would become the Blue Line. The median of some main roads had already been allocated to serve as the right of way for what would become the CTrain's Blue Line, and the first 9.8-kilometre (6.1 mi) section opened in 1985, before the originally proposed northwestern expansion. Both lines share a right-of-way through the downtown core. [2]

Northeast expansion

[edit]

The Blue Line's first expansion was to McKnight–Westwinds station in 2007.[3] with Martindale station and Saddletowne (the current terminus) opening in 2012.[4]

Western expansion

[edit]

In February 2008 the Western expansion of the CTrain began, extending the line from downtown towards 69 Street SW, and adding an additional six stations. The Western expansion opened at the end of 2012, ahead of the planned 2013 opening.[5]

Construction of the western extension of what is now the Blue Line.

Capacity upgrade

[edit]

Up until the completion of the Red Line's Fish Creek–Lacombe station, all platforms for the CTrain were originally designed to service three-car trains, although there had been enough space allotted to allow four-car trains. Beginning in 2007 construction on station platforms began to expand the entire network to allow four-car trains, with the project being completed in 2017 for CA$300 million.[6] In 2017, Calgary Transit began running four-car trains on the Blue Line. The increase from three-car trains realized an additional capacity of 200 passengers per trip.[7]

Stations and route

[edit]
Diagram of the CTrain network, showing the Blue Line.

Starting at 69 Street station, the Blue line runs along 17 Avenue SW, crossing Sarcee Trail, passes briefly underground towards Westbrook Mall, and then follows along Bow Trail.[5] The line then continues to Downtown Calgary where it shares a right of way with the Red Line along 7 Avenue S. The two lines diverge after City Hall station, where it turns north to cross the Bow River, and runs along the median of Memorial Drive, crossing Deerfoot Trail (Highway 2), to 36 Street NE, where it turns northbound, continuing within the median of 36 Street NE, crossing 16 Avenue NE (Highway 1 / Trans-Canada Highway), and McKnight Boulevard. After McKnight Boulevard, 36 Street NE turns to Métis Trail, and the Blue Line passes under a bridge in the northbound lane running parallel to the road until Martindale station, at which point it turns northeast to its terminus at Saddletowne station.

Key
Terminus
Westbound only
Eastbound only
Station Opened
(rebuilt)
Transfers Notes
69 St 2012
Sirocco 2012
45 St 2012
Westbrook 2012 MAX Teal
Shaganappi Point 2012
Sunalta 2012
Downtown West–Kerby 2012
8 St Southwest 1981 (2009) Red Line Fare-free zone
7 St Southwest 1981 (2009) Fare-free zone
6 St Southwest 1981 (2009) Fare-free zone
4 St Southwest 1981 (2011) Fare-free zone
3 St Southwest 1981 (2010) Fare-free zone
1 St Southwest 1981 (2005) Fare-free zone
Centre St 1981 (2000) Fare-free zone
City Hall 1981 (2011)
300 Airport
MAX Yellow
MAX Purple
Fare-free zone
Bridgeland/Memorial 1985 (2014)
Zoo 1985 (2014)
Barlow/Max Bell 1985 (2014)
Franklin 1985 (2013)
Marlborough 1985 (2013)
Rundle 1985 (2013) MAX Orange
Whitehorn 1985 (2011)
McKnight–Westwinds 2007 None
Martindale 2012
Saddletowne 2012 100 Airport

[8][9]

Future expansion

[edit]

Northeast leg

[edit]

The city of Calgary published a study in 2012 describing a 7.5-kilometre (4.7 mi) extension for the northeast leg of the Blue Line beyond the existing terminus at Saddletowne station, to run north along the west side of 60 Street NE, continuing west along the north side of 128 Avenue NE, then running north along the west side of 32 Street NE. One at-grade crossing would be created at 60 St and 88 Ave; the route would be grade-separated at the crossings of Airport Trail (above grade), Country Hills Blvd (below grade), 128 Ave (below), and Metis Trail (above). The study included four stations:[10]: 1–2 

  • 88 Avenue: an at-grade station at 88 Avenue NE and 60 Street NE, with 500 park and ride stalls[10]: 13–15 
  • Country Hills Boulevard: a below-grade station at Country Hills Boulevard and 60 Street NE[10]: 15 
  • 128 Avenue: an at-grade station at 128 Avenue NE and Redstone Street, with 200 parking spaces[10]: 15–17 
  • Stoney Trail: the terminal at-grade station at 32 Street NE and Barlow Crescent, with 100 parking spaces[10]: 17–19 

The four stations were studied with side-loading platforms, but the proposed terminal station at Stoney Trail would have sufficient space for a centre-loading platform. 230 m (750 ft) of tail tracks for LRV storage would be built north of the Stoney Trail station.[10]: 2, 4  By 2017, the proposed northeast leg extension had been truncated to three stations (ending at 128 Ave) and 5 km (3.1 mi). However, the project is not included in the City's mobility plan and has yet to be funded.[11]

The same 2012 study included concepts to provide transit connections from Calgary International Airport to either Saddletowne or the proposed 88 Ave station using light rail, tram, or bus services. The potential airport connector rail line along Airport Trail could be extended further west to connect with the proposed Green Line north-central leg, specifically at the future 96th Ave N station. [12]

West leg

[edit]

An extension west from the current terminus at 69 Street to a future station at Aspen Woods has been planned but not funded. The Aspen Woods station would be at approximately the intersection of 17 Avenue and 85 Street SW.[13]

See also

[edit]

References

[edit]
  1. ^ "SD160 Light Rail Vehicle: Calgary, Canada" (PDF). Siemens Transportation Systems, Inc. 2007. Archived from the original (PDF) on October 26, 2010. Retrieved January 23, 2011. Catenary supply voltage: 600 Vdc
  2. ^ Hubbel, John; Colquhoun, Dave (12 April 2006). "Light Rail Transit in Calgary The First 25 Years" (PDF). Retrieved 12 March 2018. {{cite journal}}: Cite journal requires |journal= (help)
  3. ^ McKnight-Westwinds Rider's Guide Archived 2011-05-20 at the Wayback Machine
  4. ^ "Saddletowne, Martindale LRT Openings Confusing For Some In Calgary". HuffPost Canada. 27 August 2012. Retrieved 12 March 2018.
  5. ^ a b "West leg of LRT on track for December opening". CTV Calgary. 7 November 2012.
  6. ^ Markusoff, Jason (8 May 2014). "Four-car LRT project's price tag hits $300M". Calgary Herald. Retrieved 12 March 2018.
  7. ^ Gilligan, Melissa (1 May 2017). "Calgary Transit launches 4-car CTrain service on Blue Line LRT". Global News. Retrieved 12 March 2018.
  8. ^ "2019_ctrainmap" (PDF). Calgary Transit. Archived (PDF) from the original on 2019-02-14. Retrieved 2020-07-19.
  9. ^ "2019 Mini Metro Network-SWTSR" (PDF). Calgary Transit. Archived (PDF) from the original on 2020-03-27. Retrieved 2020-07-19.
  10. ^ a b c d e f HDR, Inc. (September 2012). Functional Study for a future Light Rail Transit alignment from Saddletowne Circle at 60th Street NE to Stoney Trail North via 128th Avenue NE (PDF) (Report). Calgary Transit. Archived from the original (PDF) on 6 September 2017.
  11. ^ "Blue Line (Northeast) LRT Extension Preliminary Design Study". City of Calgary. 27 April 2017. Archived from the original on 19 May 2017. Retrieved 11 June 2019.
  12. ^ HDR, Inc. (September 2012). NE LRT Functional Study: Airport Transit Link Service Options Overview (PDF) (Report). Calgary Transit. Archived from the original (PDF) on 6 September 2017.
  13. ^ Smith, Kevin (October 29, 2012). "Canada's light rail renaissance". International Railway Journal. Retrieved 21 May 2019.
[edit]
KML is not from Wikidata