Jump to content

Biryulyovskaya line

From Wikipedia, the free encyclopedia
(Redirected from 18 line)
Biryulyovskaya line
Overview
Native nameБирюлёвская линия
LocaleMoscow
Stations10 (first stage)[1]
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Technical
Line length22.2 kilometres (13.8 mi) (first stage)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

possible future connection with #17 Rublyovo-Arkhangelskaya line
ZIL
Transfer for #14 Moscow Central Circle at ZIL Transfer for #16 Troitskaya line at ZIL
Ostrov Mechty
Transfer for #2 Zamoskvoretskaya line at Tekhnopark
Klenovy Bulvar
Transfer for #11 Bolshaya Koltsevaya line at Klenovy Bulvar
Kuryanovo
Moskvorechye
Kavkazskiy Bulvar
Kaspiyskaya
Lipetskaya
Lebedyanskaya
Biryulyovo

Biryulyovskaya line (Russian: Бирюлёвская линия) or Line 18 of the Moscow Metro is a line under construction since 2021 [citation needed] which is scheduled to end in 2028+.[2] In the future, it will be connected with Rublyovo-Arkhangelskaya line.[3]

Stations

[edit]
Station Name Transfer
English Russian
ZIL ЗИЛ Transfer for #14 Moscow Central Circle at ZIL ZIL Transfer for #16 Troitskaya line at ZIL ZIL
Ostrov Mechty Остров мечты Transfer for #2 Zamoskvoretskaya line at Tekhnopark Tekhnopark
Klenovy Bulvar Кленовый бульвар Transfer for #11 Bolshaya Koltsevaya line at Klenovy Bulvar Klenovy Bulvar
Kuryanovo Курьяново
Moskvorechye Москворечное
Kavkazsky Bulvar Кавказский бульвар
Kaspiyskaya Каспийская
Lipetskaya Липецкая
Lebedyanskaya Лебедянская
Biryulyovo Бирюлево

МЦД-5 Biryulyovo-Passazhirskaya

References

[edit]
  1. ^ "Власти Москвы определились с трассировкой Бирюлевской линии метро" (in Russian). Retrieved 30 December 2020.
  2. ^ "В мэрии назвали год окончания строительства Бирюлевской линии метро". Rbc.ru (in Russian). Retrieved 8 October 2020.
  3. ^ "На карте метро может появиться 15-я линия - Рублево-Архангельская". kp.kg. 7 October 2016. Retrieved 8 October 2020.